My WebLink
|
Help
|
About
|
Sign Out
Home
pf07-034
Roseville
>
Planning Files
>
2007
>
pf07-034
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2014 9:36:04 AM
Creation date
6/17/2013 3:24:11 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
07-034
Planning Files - Type
Conditional Use Permit
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C� <br />city= of Roseville <br />Community Developme�at Dcpartment <br />2660 Civic Cenier Drive <br />Rc�seville, '�1�IN 55113 <br />• <br />June 6, �0�7 <br />CONDITIONAL tiSE PERMIT APPLICATION SUPPLEiVIENT <br />Project: King of Kings Lutheran Church & School <br />2300 North Dale Street <br />Roseville, NIN <br />Item #6: Complete LeQal Description of Propertv Involved & PID No. <br />PID # 12-29-2332 0138 <br />The West 513 feet of the South'/z of the Northwest'/4 of the Southwest'/4 of Section 12, <br />Township 29, Range 23, Ramsey County, Minnesota. <br />Item #8A: Written Narrative <br />King of Kings Lutheran Church and School is proposing to expand and remodel their <br />existing facility located at 2300 North Dale Street in Roseville. This addition would be <br />the fourth time a construction project has been initiated at this site. The original building <br />was started in 1963; the Gymnasium being the first addition in 1978; and the Sanctuary <br />the most recent addition in 1992. <br />Ministry demands of this congregation have been felt for many years and the time has <br />come to add the sorely needed space to the existing facility. This project would provide <br />the space necessary for this congregation to serve its present membership in addition to <br />reaching out more fervently to the community. <br />This project consists of three major parts and their anticipated construction timeline: <br />• New Education Wing Addition March — September 2008 <br />• Major Remodeling of Existing Facility June — September 2008 <br />• Future Expansion 2013 — 2018 <br />R�ew Education Wing Addition <br />This one-story addition contains new offices, education and meeting spaces to better <br />facilitate the ministry needs of this congregation (refer to attached plans for additional <br />information). Its exterior finish will use the prominent synthetic stucco (EIFS) found on <br />the two additions with color and texture to match the existing building. Aecent features <br />and trim elements will be used as well. Aluminum windows and entrances will be the <br />exterior window and door system to match the existing fenestration. <br />In addition the main expansion, a new Gymnasium Storage Addition is proposed to be <br />located on the south side of the existing gymnasium. This addition will replace those <br />storage spaces lost in the major remodeling as well as supplemental storage needed by the <br />congregation. This addition will be built and finished in a similar manner as the main <br />education wing addition. <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.