My WebLink
|
Help
|
About
|
Sign Out
Home
pf07-034
Roseville
>
Planning Files
>
2007
>
pf07-034
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2014 9:36:04 AM
Creation date
6/17/2013 3:24:11 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
07-034
Planning Files - Type
Conditional Use Permit
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />City af Roseville <br />Community llevelopment Department <br />2660 Civic Center Drive <br />Roseviile, MN 55113 <br />u <br />June 6, 2007 <br />Finally, the last portion of new building will 6e a detached Exterior Storage Building to <br />be the space where outdoor play equipment and maintenance equipment will be stored. <br />Again, the construction and finish of this structure will be similar to tl�at of the main <br />education wing addition. <br />.�I�Iajor Remodeling ofExisting FacilitX <br />The original building is the focus of this segment. The existing offices and classroom <br />will be gutted to make way for two new classroom spaces. The existing restrooms will <br />be remodeled to meet current ADA requirements and give the facility a much needed face <br />lift. New HVAC systems will be installed to comply with current code requirements for <br />this type of use. New automatic sprinklers will be installed in the existing classrooms <br />and corridor spaces bringing the entire facility up to a minimum one-hour fire rating to <br />meet current code requirements. The existing Gymnasium and Sanetuary spaces are not a <br />part of this work and w°ill remain in their current state. <br />Future Expansion <br />The dra��ings show future building expansions (showm dashed) which are planned for the <br />near future, possibly in five to ten years. Budget constraints will keep this proposed <br />phase in a holding pattern until space demands align v��ith financial resources. <br />Construction and finishes of these future additions will again be similar to the proposed <br />project slated for 2008. <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.