My WebLink
|
Help
|
About
|
Sign Out
Home
pf07-053
Roseville
>
Planning Files
>
2007
>
pf07-053
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2014 4:28:31 PM
Creation date
6/17/2013 3:39:18 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
07-053
Planning Files - Type
Planned Unit Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'� <br />,-� <br />Lanes, Volumes, Timings <br />5: HARMAR & SNELLING AVE 1��2/2007 <br />Actuated Cycle Length: 165 <br />Offset: 64 (39%), Referenced to phase 2:N6T and 6:SBT, Start of 1 st Green <br />Control Type: Actuated-Coordinated <br />Maximum v/c Ratio: 0.80 <br />Intersection Signal Delay: 25.1 Intersection LOS: C <br />Intersection Capacity Utilization 67.6% ICU Level of Service C <br />Analysis Period (min)15 <br />m Volume for 95th percentile queue is metered by upstream signal. <br />Splits and Phases: 5: HARMAR & SNELLING AVE <br />4-- <br />m1 � 02 04 <br />� 06 l m5 I"'► 08 <br />s - <br />� <br />q- <br />* <br />T:11959\01\Synchro12009_No-Build PM Peak Hour.syn Synchro 7- Report <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.