Laserfiche WebLink
'� <br />,-� <br />Lanes, Volumes, Timings <br />5: HARMAR & SNELLING AVE 1��2/2007 <br />Actuated Cycle Length: 165 <br />Offset: 64 (39%), Referenced to phase 2:N6T and 6:SBT, Start of 1 st Green <br />Control Type: Actuated-Coordinated <br />Maximum v/c Ratio: 0.80 <br />Intersection Signal Delay: 25.1 Intersection LOS: C <br />Intersection Capacity Utilization 67.6% ICU Level of Service C <br />Analysis Period (min)15 <br />m Volume for 95th percentile queue is metered by upstream signal. <br />Splits and Phases: 5: HARMAR & SNELLING AVE <br />4-- <br />m1 � 02 04 <br />� 06 l m5 I"'► 08 <br />s - <br />� <br />q- <br />* <br />T:11959\01\Synchro12009_No-Build PM Peak Hour.syn Synchro 7- Report <br />Page 2 <br />