Laserfiche WebLink
� � <br />Lanes, Volumes, Timings <br />5: HARMAR & SNELLING AVE 11/2/2007 <br />� � � � � � � I � � # � <br />Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations � fi �` �y � �' � �:�� � '� �,� �r <br />Volume (vph) 106 54 65 166 49 247 44 1491 221 192 1055 61 <br />IdealFlow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 <br />Lane Width (ft) 10 10 10 10 10 10 12 12 12 12 12 12 <br />Storage Length (ft) 0 0 200 150 250 180 250 180 <br />Storage Lanes 1 1 1 1 1 1 1 1 <br />TaperLength(ft) 100 100 100 100 100 100 100 100 <br />Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1,00 0.91 1.00 1.00 0.95 1.00 <br />Frt 0.850 0.850 0.850 0.850 <br />Flt Protected 0.950 0.950 0.950 0.950 <br />Satd. Flow (prot) 1652 1739 1478 1652 1739 1478 1770 5085 1583 1770 3539 1583 <br />Flt Permitted 0.722 0.719 0.950 0.950 <br />Satd.Flow(perm) 1255 1739 1478 1250 1739 1478 1770 5085 1583 1770 3539 1583 <br />Right Turn on Red Yes Yes Yes Yes <br />Satd. Flow (RTOR) 70 266 132 48 <br />Link Speed (mph) 30 30 45 45 <br />Link Distance (ft) 215 374 712 1073 <br />Travel Time (s) 4.9 8.5 10.8 16.3 <br />Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 <br />Adj. Flow (vph) 114 58 70 178 53 266 47 1603 238 206 1134 66 <br />Shared Lane Traffic (%) <br />Lane Group Flow (vph) 114 58 70 178 53 266 47 1603 238 206 1134 66 <br />Turn Type Perm Perm Perm Perm Prot Perm Prot Perm <br />Protected Phases 8 4 5 2 1 6 <br />Permitted Phases 8 g 4 4 2 6 <br />Total Split (s) 46.0 46.0 46.0 46.0 46.0 46.0 16.0 80.0 80.0 39.0 103.0 103.0 <br />Total Lost Time (s) 5.5 5.5 5.5 5.5 5.5 5.5 5.0 6.0 6.0 5.0 6.0 6.0 <br />Act Effct Green (s) 29.2 29.2 29.2 29.2 29.2 29.2 10.2 95.8 95.8 23.5 111.5 111.5 <br />Actuated g/C Ratio 0.18 0.18 0.18 0.18 0.18 0.18 0.06 0.58 0.58 0.14 0.68 0.68 <br />v/c Ratio 0.51 0.19 0.22 0.81 0.17 0.55 0.43 0.54 0.24 0.82 0.47 0.06 <br />Control Delay 67.9 56.3 11.7 89.8 55.8 9.9 86.5 24.0 9.7 108.3 4.3 1.0 <br />Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 <br />Total Delay 67.9 56.3 11.7 89.8 55.8 9.9 86.5 24.0 9.7 108.3 4.3 1.0 <br />LOS E E B F E A F C A F A A <br />Approach Delay 48.9 43.4 23.8 19.3 <br />Approach LOS D D C B <br />Queue Length 50th (ft) 113 54 0 187 49 0 50 378 50 231 106 2 <br />Queue Length 95th (ft) 169 92 44 262 86 79 97 543 129 320 157 m5 <br />Internal Link Dist (ft) 135 294 632 993 <br />Turn Bay Length (ft) 200 150 250 180 250 180 <br />Base Capacity(vph) 308 427 416 307 427 563 118 2952 974 365 2391 1085 <br />Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0 <br />Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0 <br />Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0 <br />Reduced v/c Ratio 0.37 0.14 0.17 0.58 0.12 0.47 0.40 0.54 0.24 0.56 0.47 0.06 <br />Intersection Summary <br />Area Type: Other <br />Cycle Length: 165 <br />T:11959\011Synchro12009_Build PM Peak Hour.syn Synchro 7- Report <br />Page 1 <br />