Laserfiche WebLink
� <br />1�7 <br />r/� <br />November 28, 2007 <br />James A. Swanson <br />Emmes Realty Services LLC <br />2100 N. Snelling Avenue <br />Roseville, Minnesota 55113 <br />RE: Har Mar PUD application- Outlot 82 <br />Dear Mr. Swanson; <br />�., <br />As a part of the Har Mar PUD application, the following are items that need to be addressed as a <br />part of the Har Mar PUD application: <br />Reimbursement for Traffic Engineering: according to City policy, the developer is <br />responsible for all costs associated with reviewing their application. As you are aware, we <br />have been using SRF consulting to assist us with the traffic review for your application. To <br />date total cost for this review has been $4,429.42. Attached are the invoices for this work. <br />Please reimburse the City this amount. <br />Snelling/Skillman/ HarMar intersection: It is important to the success of HarMar that a safe <br />and efficient access to the public street system is maintained. The need to improve the <br />HarMar/ Skillman/ Snelling intersection has been identified by the City and State both in the <br />short term, through the 2008 project, and the long term, through a future project to address <br />the safety and operating issues caused by an offset intersection. As a result of this we feel <br />that an additional condition should be added to this approval. Half of all costs to reconstruct <br />the HarMar/ Skillman/ Snelling intersection are the responsibility of the City of Roseville. <br />HarMar is the only property served by the easterly leg of this intersection and receives a <br />direct benefit by its safe and efficient operation. As a result of this, staff is recommending <br />that we condition their approval on a proportional, (25%) cost participation in any future <br />intersection improvements. The state originally stated that the City cost share (50%) of this <br />intersection improvement cost was $160,000. They have indicated that we will be getting a <br />final cost share agreement in the coming weeks. <br />Please contac me with que ions, 651-792-7042 or deb.bloom(a�ci.roseville.mn.us. <br />in erely, <br />U� <br />ra M. Bl om <br />City Engineer <br />CC: Duane Schwartz, Public Works Director <br />Thomas Paschke, City Planner <br />2660 Civic Center Drive ❖ Roseville, Minnesota 55113 <br />651-792-ROSE ❖ TDD 651-792-7399 ❖ wwwci.roseville.mn.us <br />Recycled paper - 30% post-consumer content <br />