Laserfiche WebLink
Pathway Master Buildout Plan <br />Length <br />Estimated Cost <br />Funding <br />Traffic <br />Score <br />Description <br />(Miles) <br />Build Year <br />Source <br />Counts <br />Retaining <br />(Scoring per 2008 Pathway Master Plan) <br />On Street <br />Signage <br />Off Road <br />Bridge <br />Striping <br />Drainage <br />wall <br />Total <br />A light traffic overhead bridge structure across <br />26 <br />Rosedale to HarMar Connection <br />114.5 <br />Highway 36 and pathway connection between <br />1 <br />$370,000 <br />$1,600,000 <br />$175,000 <br />$2,145,000 <br />Future <br />41,000 <br />Rosedale and Har Mar Mall- cost does not include <br />potential right- of- way needed for construction <br />8 <br />Roselawn Ave <br />110 <br />On road and off -road pathways from west City <br />2.25 <br />$360,000 <br />$1,012,500 <br />$4,725 <br />$393,750 <br />$1,770,975 <br />Future <br />2,900 <br />boundary to Ham line Avenue <br />Off Road <br />There is already a off road facility in Falcon Heights <br />13,700 <br />in this corridor <br />Cty Boundary to Cleveland <br />6 ft wide concrete sidewalk- one side <br />0.75 <br />$337,500 <br />$131,250 <br />$25,875 <br />$494,625 <br />Cleveland to Fairview <br />6 ft wide concrete sidewalk- one side <br />0.5 <br />$225,000 <br />$87,500 <br />$17,250 <br />$329,750 <br />Fairview to Snelling <br />6 ft wide concrete sidewalk- one side <br />0.5 <br />$225,000 <br />$87,500 <br />$17,250 <br />$329,750 <br />Snelling to Hamline <br />6 ft wide concrete sidewalk- one side <br />0.5 <br />$225,000 <br />$87,500 <br />$17,250 <br />$329,750 <br />On Road <br />Difficult to construct without a full road project and <br />Falcon Heights cooperation <br />Cty Boundary to Cleveland <br />0.75 <br />$120,000 <br />$1,575 <br />$121,575 <br />Cleveland to Fairview <br />0.5 <br />$80,000 <br />$1,050 <br />$81,050 <br />Fairview to Snelling <br />0.5 <br />$80,000 <br />$1,050 <br />$81,050 <br />Snelling to Hamline <br />0.5 <br />$80,000 <br />$1,050 <br />$81,050 <br />Northeast Diagonal Trail Connection (Walnut <br />County Road C trail connection to the NE <br />25 <br />110 <br />Future <br />14,500 <br />to Co Rd C ) <br />Diagonal Trail into Minneapolis <br />Option 1- along County Road C/ Walnut <br />$343,636 <br />$125,284 <br />$12,633 <br />$481,553 <br />10 ft wide bituminous attached pathway south <br />0.55 <br />$263,636 <br />$96,117 <br />$12,633 <br />side Count Road C <br />East side Walnut 8 ft bituminous <br />0.17 <br />$80,000 <br />$29,167 <br />Option 2 -Along the Railroad right- of -way <br />8 ft wide bituminous trail along tracks <br />0.87 <br />$348,485 <br />$152,462 <br />$500,947 <br />south of County Road C <br />20 <br />Dale St South of Reservoir Woods <br />109.7 <br />Off - street bituminous trail from Reservoir Woods <br />0.5 <br />$200,000 <br />$87,500 <br />$40,250 <br />$327,750 <br />Future <br />9,500 <br />Park to Lar enteurAvenue <br />Work with Arden Hills to develop a regional <br />pathway connection along Snelling Avenue to Old <br />Snelling Avenue in Arden Hills connecting <br />13 <br />TH 51 pathway connection to Old Snelling <br />104 <br />Roseville to MoundsView High School, Valentine <br />0.5 <br />$200,000 <br />$87,500 <br />$17,250 <br />$304,750 <br />Future <br />31,000 <br />(Arden Hills) <br />Hills Elementary School, Bethel College, Lake <br />Johanna Park and County Road E2 commercial <br />businesses <br />An off -road pathway from County Road B -2 to TH <br />14 <br />Ham line Ave <br />102.3 <br />51 (Snelling)- sidewalk exists on west side from <br />1.75 <br />$718,500 <br />$306,250 <br />$60,375 <br />$1,085,125 <br />Future <br />6,817 <br />County Road B -2 to County Road C <br />Off Road <br />County Road C2 to City Bdry <br />8 ft wide Bituminous Trail- one side <br />0.75 <br />$300,000 <br />$131,250 <br />$25,875 <br />$457,125 <br />County Road C to County Road C2 <br />8 ft wide Bituminous Trail- one side <br />0.5 <br />$200,000 <br />$87,500 <br />$17,250 <br />$304,750 <br />County Road B2 to County Road C <br />tear out sidewalk and construct 8 ft wide trail <br />0.5 <br />$218,500 <br />$87,500 <br />$17,250 <br />$323,250 <br />Pathway connection that creates a link between <br />3 <br />to County Road C2 Link <br />98.5 <br />the corner of Millwood and Chatsworth through <br />0.25 <br />$100,000 <br />$43,750 <br />$11,500 <br />$155,250 <br />2013 -2015 <br />NA <br />the Ramsey County open space to County Road <br />C2 <br />Pathway connection along Alta Vista Drive <br />34 <br />Alta Vista Drive <br />94.25 <br />between Larpenteur Avenue and Reservoir <br />Future <br />Unknown <br />Woods Park <br />Option 1: On Road <br />stripe a section of the road and designate for <br />0.45 <br />$1,125 <br />$945 <br />$2,070 <br />pedestrians - would require no parking on the road <br />Option 2: Off Road Sidewalk <br />6 ft wide sidewalk on one side of the road <br />0.45 <br />$202,500 <br />$78 750 <br />$31 050 <br />$312 300 <br />