Laserfiche WebLink
Pathway Master Buildout Plan <br />Length <br />Estimated Cost <br />Funding <br />Traffic <br />Score <br />Description <br />(Miles) <br />Build Year <br />Source <br />Counts <br />Retaining <br />(Scoring per 2008 Pathway Master Plan) <br />On Street <br />Signage <br />Off Road <br />Bridge <br />Striping <br />Drainage <br />wall <br />Total <br />On and off road between Cleveland and Fairview <br />1 <br />County Road D <br />93.75 <br />Avenue- the road has shoulders, cost is for off <br />0.5 <br />$200,000 <br />$87,500 <br />$13,800 <br />$301,300 <br />Future <br />8,400 <br />road only <br />On and off road, between County Road C and <br />County Road D. On road is not recommended <br />10 <br />Cleveland Ave <br />92.75 <br />until road is reconstructed. Segment has a <br />0.85 <br />$382,500 <br />$148,750 <br />$23,460 <br />$554,710 <br />Future <br />6,700 <br />pathway on the west side from just north of the <br />35W ramps all the way to County Road D (around <br />Centre Pointe <br />Wal Mart is constructing a sidewalk on the east side <br />Off road <br />from County Road C to Twin Lakes Parkway so the <br />segment is not included <br />Twin Lakes Parkway to County Road C2 <br />6 ft wide sidewalk <br />0.4 <br />$180,000 <br />$70,000 <br />$11,040 <br />$261,040 <br />Count Road C2 to Count Road D <br />6 ft wide sidewalk - already at A lewood <br />0.45 <br />$202,500 <br />$78,750 <br />$12,420 <br />$293,670 <br />9 <br />LarpenteurAve <br />925 <br />n off-road trail from Reservoir Woods o a ier <br />0.5 <br />$225,000 <br />$87,500 <br />$13,800 <br />$326,300 <br />Future <br />12,800 <br />