My WebLink
|
Help
|
About
|
Sign Out
Home
2013-06-25_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2013
>
2013-06-25_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2013 4:09:52 PM
Creation date
6/20/2013 4:01:20 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
6/25/2013
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
View images
View plain text
Pathway Master Buildout Plan <br />Length <br />Estimated Cost <br />Funding <br />Traffic <br />Score <br />Description <br />(Miles) <br />Build Year <br />Source <br />Counts <br />33 <br />Cohansey St to HANC Connection <br />89.5 <br />Pathway connection between Cohansey Street and <br />Retaining <br />(Scoring per 2008 Pathway Master Plan) <br />On Street <br />Signage <br />Off Road <br />Bridge <br />Striping <br />Drainage <br />wall <br />Total <br />HANC <br />SEGMENTS WITH SCORES LESS THAN 90 <br />33 <br />Cohansey St to HANC Connection <br />89.5 <br />Pathway connection between Cohansey Street and <br />Future <br />NA <br />HANC <br />30 <br />Villa Park Connections <br />88.75 <br />Pathway connection from Shryer Ave and from Ryan <br />Future <br />NA <br />Ave into Villa Park <br />On and off road pathways from the west City <br />2 <br />County Road C2 (W of Snelling) <br />87 <br />Boundary to Snelling Avenue This corridor would <br />Future <br />2,300 <br />include a grade separated crossing of 35W <br />3 <br />County Road C2 (E of Snelling) <br />86 <br />On and off road pathways from the Snelling Avenue <br />Future <br />2,350 <br />to Victoria Street <br />29 <br />Lovell to Minnesota Connection <br />80.25 <br />Pathway connection between Lovell Ave and <br />Future <br />NA <br />Minnesota Street <br />27 <br />Heinel Drive Connection <br />75.5 <br />Pathway connection between S Owasso Blvd and <br />Future <br />NA <br />County Road C along Heinel Drive <br />28 <br />Judith to Iona Connection <br />72.75 <br />Pathway connection between Judith Ave and Iona <br />0.1 <br />$40,000 <br />$17,500 <br />$5,750 <br />$63,250 <br />Future <br />Parks <br />NA <br />Lane- 8ft wide bituminous <br />Renewal <br />23 <br />Langton Lake Loop <br />72.5 <br />Pathway that goes around all of Langton Lake <br />Future <br />NA <br />On and off road facilities as a part of public street <br />infrastructure project within Twin Lakes <br />Developer/ <br />24 <br />Twin Lakes Redevelopment Area Connections <br />56.75 <br />Redevelopment area (between Fairview and <br />Future <br />TIF /Assess <br />NA <br />Cleveland) Provide connection from the <br />redevelopment area into Langton Lake Park <br />32 <br />Eustis to St Croix Connection <br />49 <br />Pathway connection between Eustis Street and St <br />Future <br />NA <br />Croix Street <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).