� Niemorandum to: Kent Peterson <br />Bituminous Roadways <br />Octvber 8, 2010 <br />Page 2 <br />As stated in the EAW, the directional distribution is expected to be 35 percent to and <br />frorn the north and 65 percent to and from the south. Trips [o and from the north will <br />access 1-35W at County Road. C. Trips between the project site and 1-35W will use <br />Walnut Street, Terminal Road, and Long Lal:e Road to access County Road C. <br />Trips to and from the south �vill usc both 1-35W and T.H. 284. 'I'rips to and tcom the <br />south on I-35W will access I-35W at Industrial Boulevard. Trips to and from the south <br />on T.H. 280 will access T.H. 28U at the direct access on Terminal Road. Trips to and <br />from the south will use Terminal Road, Walnut 5treet, and Industrial Boulevard to access <br />the regional roadway system. <br />The capacity of the surrounding roadways was reviewed to determine the impact of the <br />proposed project. Generalized planning level average daily traffic {ADT� voiume <br />thresholds for each type of roadway that maintain acceptable ievels of service �vere <br />compared to post project traffic volume projections. At all locations the existing <br />roadways have adequate capacity to accommodate the projected traffic volumes. <br />Additional volume information is described below. <br />On Walnut Street adjacent to the site, the three lane section has maximum ADT threshold <br />-- of approximately 14,90U vehicles per day. The 2009 ADT plus the maximum project <br />trips equates to 3,335 (22 percent of maximum), which is far less that the maximum ADT� <br />threshold. On Walnut Street south of the site, the two lane section has maximum ADT <br />lhreshold of approximately 8;500 vehicles per day. The 2009 AD'1' plus the maximum <br />project trips equates to 3,335 (39 percent of maximum), which is far less that the <br />maximum ADT threshold. On Walnut Street north of terminal road, the three lane <br />section has maximum ADT threshold of approximately 14,900 vehicles per day, The <br />2009 ADT plus the maximum project trips equates to 4,285 (29 percent of maximum, <br />�vhich is far less rhat the maximurn ADT threshold. On Terminal Road immediately east <br />of Walnut Street, the foi�r lane section has maximum nDT ihreshold of approximately <br />20,100 vehicles per day. The 2009 ADT plus the project trips equates to 4,095 (20 <br />percent of maximum), which is far less that the maximum ADT'threshold. <br />Overall, the surrounding roadway system has adequate capacity to accommodate the <br />proposed project. As shown above, the local street system h�s adequate capacity to <br />accommodate the projected traffic volumes. The praject will have minimal impact on the <br />regiona! system. This conclusion is supported by a comment letter submitted by Mn/DOT <br />on the EA17V. <br />� ued��,cmwau-e.���� av � zoos xo�<„u� c tr,:�r�� d�v�.rt;� �,,,,, ��u ��seo,�_�as•2oi o-�cH a�� <br />