My WebLink
|
Help
|
About
|
Sign Out
Home
2013_0701_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2013
>
2013_0701_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2013 10:11:10 AM
Creation date
6/27/2013 1:09:39 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The address shall be recorded on a form acceptable to the City. <br />Contractor shall report the addresses to the City Recycling <br />Note: a copy of the form is to <br />Coordinator at the end of each month ( <br />be included with the proposal <br />). <br />Upon request, the City Recycling Coordinator will undertake efforts <br />to educate the resident or owner regarding proper materials <br />preparation. <br />Multiple FamilyDwellings <br />Contaminated carts of material will not be collected and a tag will be <br />left indicating the reason the material is unacceptable. The Contractor <br />shall also notify the City Recycling Coordinator by phone that the <br />material was left and the reason that the material was unacceptable. <br />It will be the responsibility of the Contractor to obtain cooperation <br />from the building owner/manager in removal of trash and separation <br />of acceptable materials so that the carts can be serviced. <br />5.08 Collection Zones <br />By Ordinance the City of Roseville is divided into five zones, each <br />with its own day of the week for collection of refuse and recycling as <br />detailed in Exhibit A. The number of housing units in each collection <br />zone is detailed in Exhibit B. <br />5.09.Collection Hours <br />Contractor shall maintain sufficient equipment and personnel to <br />assure that all collection operations commence no earlier than 7 a.m. <br />and are completed by 6:00 p.m. on the scheduled collection day. <br />5.10. Cleanup Responsibilities <br />Contractor shall adequately clean up any materials spilled or blown <br />during the course of collection and/or hauling operations. Any <br />unacceptable materials left behind should be secured within <br />resident’s recycling container. Driver shall take all precautions <br />possible to prevent littering of unacceptable recyclables. Contractor <br />shall have no responsibility to remove any items that are not <br />recyclable materials and have been properly dealt with as specified in <br />5.07. <br />20 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.