Laserfiche WebLink
collection zone on its designated day as defined in Exhibit A <br />when the Contractor has not received an extension of <br />collection hours from the Recycling Coordinator or <br />designated alternate. <br />Failure to Complete a Majority (50%) of the Collection <br />f) <br />District <br />$2,500 for each incident. <br />Failure to clean up material spilled by Contractor within <br />g) <br />six (6) hours of verbal or written notification <br />$250 each incident <br />Failure to leave an education tag when non-recyclable <br />h) <br />material or material that is inappropriately prepared <br />according to specifications in Item 5.08 is not collected <br />$100 each incident <br />Failure or neglect to collect recycling from a missed <br />i) <br />pickup location according to specifications in 5.11 <br />$250 each incident <br />Distributing recycling carts without recycling symbols or <br />j) <br />labels that include text and graphics depicting what <br />materials may be placed in the carts <br />$100 each incident <br />Failure to maintain recycling carts in proper working <br />k) <br />order as specified in 5.05 <br /> $100 each incident <br />Failure to provide a complete monthly report as specified <br />l) <br />in 6.01 and 6.02. <br /> $250 each incident <br />Failure to return bin/cart to curbside location <br />m) <br /> $100 each incident <br />36 <br /> <br />