My WebLink
|
Help
|
About
|
Sign Out
Home
pf_03717
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF3000 - PF3801
>
3700
>
pf_03717
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2016 11:39:06 AM
Creation date
7/2/2013 8:55:12 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
3717
Planning Files - Type
Interim Use Permit
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Erosion Control: Erosion control will comply with an approved stormwater pollution prevention plan <br />(SWPPP). Best Management practices will be utilized, including installation of a silt fence along the <br />perimeter of the recycle staging area. Silt fence will also be placed around the resultant crushed material <br />stockpile to prevent erosion prior to re-use of the material as road base. <br />Dust Control: Dust will be managed on site per the Minnesota Pollution Control Agency's standards for <br />non-metallic processing plants. Dust results from handling materials having a high percentage of content <br />that would pass through a#200 sieve (200 openings per square inch). Silts and clays can have 50% or <br />more material passing the #200 sieve. Recycle aggregate base materials have a content ranging from 3 to <br />7% that would pass through a#200 sieve. Additionally, fractured concrete particles tend to form a crust <br />once they are stockpiled; this crust minimizes the amount of dust that is generated. During the crushing <br />process, spray bars on the crushers add water to the resultant pile to assist in crust formation. Stockpiles <br />are monitored weekly to determine the moisture content and additional water is added if needed; a <br />minimum moisture content of 1.5% is required. In areas of truck and equipment traffic, water will be <br />applied to control and prevent fugitive dust. Street sweeping will be einployed as necessary to maintain <br />dust free public roadways. <br />Vibrations: A seismograph will be installed to monitor vibrations at the beginning of the crushing cycle <br />to confirm vibration thresholds are not exceeded. Any vibrations in excess of acceptable thresholds will <br />result in the crushing operations being modified to conform to levels which prevent noticeable impacts to <br />adjacent properties. <br />Please contact me with any questions you may have or if further information is required. <br />Sincerely, <br />Ro tlund Homes ,, <br />Theresa A Greenfield <br />Director of Land Developm nt <br />Cc: Joe Samuel, RLK Incorporated <br />
The URL can be used to link to this page
Your browser does not support the video tag.