My WebLink
|
Help
|
About
|
Sign Out
Home
res_9667
Roseville
>
City Council
>
City Council Resolutions
>
09xxx
>
9600
>
res_9667
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 8:39:51 AM
Creation date
12/2/2004 10:04:54 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Resolutions
Resolution #
9667
Resolution Title
Approving an Excavation Permit for Innovative Designs to Excavate up to 5,000 Cubic yards of Soil from a Vacant Site at 2775 Victoria Street
Resolution Date Passed
7/12/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />remove up to 5,000 cubic yards of soil for the purpose of re-grading the parcel and constructing <br />a single family at 2775 Victoria Street be granted, with the following provisions: <br /> <br />1. On-site grading must be verified in the field to insure that drainage is not diverted <br />to adjacent properties. <br /> <br />2. Prior to site grading, and before any utility construction is commenced or building <br />permits are issued, an erosion control plan must be submitted for approval, and all <br />erosion control actions shall be implemented and inspected. <br /> <br />3. Grading and retaining walls shall be constructed as shown in the application. <br /> <br />4. Access must be provided to the upper level for maintenance operation such as lawn <br />mowing. <br /> <br />5. Drainage must be directed away from the lot to the north to ensure no added water <br />is diverted to this property. <br /> <br />6. Silt fence or approved erosion control must be installed along all disturbed areas. <br /> <br />7. Restoration of disturbed area must be completed within 60 days of disturbance. <br /> <br />8. The excavated soil must be removed from City. <br /> <br />9. The applicant is responsible for soil and debris within the street right-of-way, which <br />must be cleaned and materials removed each day when hauling from the site occurs. <br /> <br />10. Hours of operation shall be 7:00am to 6:00pm weekdays. <br /> <br />11. A performance bond in the amount of $5,000 is required to insure the work is <br />completed correctly and within 60 days of permit issuance. <br /> <br />The motion for the adöption ofthe foregoing resolution was duly seconded by Council <br />Member Goedeke, and upon a vote being taken thereon, the following voted in favor: Mastel, <br />Wiski, Goedeke, Wall <br />and the following voted against the same: none <br /> <br />WHEREUPON said resolution was declared duly passed and adopted. <br /> <br />Q:\Zoning\ExcavationPennit2.775VictoriaRCA-Res(071299).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.