My WebLink
|
Help
|
About
|
Sign Out
Home
pf_03781
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF3000 - PF3801
>
3700
>
pf_03781
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2014 12:34:14 PM
Creation date
7/3/2013 11:36:30 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
3781
Planning Files - Type
Variance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Parcel "B". <br />g. Tl�e applicant must record the two lot minor subdivision survey within 60 days <br />after the approval of the City Council. Public utility and drainage easements of 5 <br />feet are required on the sides and rear lot line. <br />h. For Parcel "B", the applicant must apply for and receive a Dale Court driveway <br />access pernlit from the Roseville Public Works Director prior to issuance of any <br />building or grading pernlit. The existing looped driveway must be removed as part <br />of the building permit, or the owner of Parcel B must provide an access easement <br />for continued use of the driveway by the owner of Parcel A. It the looped drive is <br />to remain, the access easement must be submitted as part of the building permit <br />application. <br />A grading plan, soil borings, and the survey ("B" above) illustrating lot lines and <br />house setbacks must be submitted with the building permit application. <br />j� Within thirty (30) days after approval by the City Council, the applicant shall <br />su�ply tliE �nal survey t� i�1� �GTili�lUi�ily DCVCi.��illCrii Birector :;r revlel'J ull� <br />approval. A certificate of survey shall be required on all proposed parcels. After <br />completion of the review and approval by the City Manager, the survey shall be <br />recorded by the applicant with the Ramsey County Recorder within sixty (60) <br />days. Failure to record the subdivision within sixty (60) days shall nullify the <br />approval of the subdivision. (Ord. 1171, 9-23-1996) <br />Member White asked if a variance could be requested by the future owner (yes). Is there a house <br />plan to approve with this request? (No, not at this time). <br />Member Boerigter asked for clarification of the conditions which would be placed on the fiiture <br />house He asked if the lot size variance was unusual in Roseville (no). Where would the access <br />point (driveway) he located? (on Dale Court). What is the lot coverage? (less tl�an 30%). <br />Member White asked if the new owner of the lot is almost required to get a variance (no) because <br />the P1amling Commission is validating the need for a variance by approving the lot. Member <br />Wozniak asked if the conditions prohibiting a variance could be stated. (cannot prol�ibit a future <br />owner from requesting a variance). Member poherty expressed concern that the next buyer will <br />not understand the restriction of this lot. Member White asked if the Commission could describe <br />his requirements to build within the setback triangle on the lot. <br />Todd Iliff, representing the owner and family, explained the proposal to sell the lot. He said <br />safety and sight line issues are not major concerns when tunling on to Dale Street. <br />The design of the home, reasonably sized, would be consistent with the neighborhood. He did <br />hire an architect who tested a number of housing shapes. Member White described a similar <br />home on Como Avenue. <br />Member Bakeman asked for sewer and soil boring information on the site. Mt. Iliff explained <br />RCA PF3655(082265} - Pagc 8 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.