Laserfiche WebLink
e. For Parcel "B" a grading plan, soil borings, and the survey illustrating lot lines <br />and house setbacks must be submitted with the building permit application. <br />f. Within thirty (30) days after approval by the City Council, the applicant shall <br />supply the final survey to the Community Development Director for review and <br />approval. A certificate of survey shall be required on all proposed parcels. After <br />completion of the review and approval by the City Manager, the survey shall be <br />recorded by the applicant with the Ramsey County Recorder within sixty (60) <br />days. Failure to record the subdivision within sixty (60) days shall nullify the <br />approval of the subdivision. (Ord. 1171, 9-23-1996) <br />7.0 SUGGESTED CITY COUNCIL ACTION: <br />7.1 BY MOTION, RECOMMEND APPROVAL of the MINOR SUBDIVISION (Three <br />Parcel Minor Subdivision City Code § 1104.04E) creating two parcels A and B(Parcel <br />"A" to have the existing house) with a parcel size the meet or exceed the requirements of <br />§1004.016 or the Roseville City Code based on the findings in Section 5 and subject to <br />the conditions of Section 6 of the project report dated October 4, 2006. <br />Prepared by: City Planner Thomas Paschke (651-792-7074) <br />Attachments: Location map, aerial photos, site plan, narrative <br />PF3786_RCA_100906 - Page 4 of4 <br />