Laserfiche WebLink
� <br />� <br />• There are no sensitive natural features in proximity to the proposed patio. <br />• The patio will use a flower bed to transition to the pool. This landscaping, along with the <br />stamped concrete, is designed to allow the patio to be aesthetically pleasing, improve the <br />character of the property, and to integrate seamlessly with the natural surroundings. <br />• The only neighbor will be able to see this patio is on our West, Dr. William and Sandy Brennom. <br />Dr. Brennom is a recently retired pediatric surgeon and his wife is a nurse, making them ideally <br />suited to understand and empathize with Noah's handicapped status. Most importantly, the <br />Brennom's have no objection to the patio and believe its addition will be an improvement in the <br />property. Finally, the Brennom's intend to contact the Roseville planning office to express their <br />support for this application and the proposed patio. <br />• The neighbor on our East, Betty Pomeroy, will not be able to see the patio due to the location of <br />her house in relation to our house and screen porch. However, she has no objections to the <br />patio. <br />• Per the support of our neighbor's affected by this request, we are requesting that the 10-day <br />appeal period be eliminated. <br />• The potential for the patio to cause storm water damage has been alleviated by the following <br />storm water mitigation plan. <br />Storm Water Miti�ation Plan <br />Storm water will be diverted from the patio by the following means: <br />• A newly installed gutter system on the house will empty into a drain pipe which will carry water <br />to a drain system located in the flower bed in between the patio and pool. <br />• The drain system will collect water from the gutters and the patio and divert this water to the <br />street. Additionally, the flower bed will act as a rain garden. <br />• In order to accomplish this, the drain system consists of approximately 40 feet of graded 4 inch <br />solid PVC running E-W between the pool and patio. This connects to approximately 100 feet of <br />graded 4 inch solid PVC running N-S in between our house and the Brennom's which will carry <br />excess run-off water to the street storm sewer system. <br />Thank you very much for your expedient review of this request. We are desperately trying to complete <br />this patio so as to allow use of the pool by Noah during our extremely short Minnesota swimming <br />season. <br />If you have any questions or comments, please contact us at anytime at the contact information <br />provided above. <br />