Laserfiche WebLink
Pathway Master Buildout Plan Length <br />Score Description (Miles) <br />(Scoring per 2008 Pathway Master Plan) On Road Signage Off Road <br />11 Fairview Ave (North of C) 118.5 On -road and off -road pathways between County 1 <br />Road B2 and County Road D <br />On road exists with shoulders today- cost is for <br />On Road ,_ 1 1 $2,500 <br />my Road C Sidewalk <br />117.5 Sidewalk on the north Sid <br />from Western to Rice Street <br />0.5 <br />Estimated Cost <br />Build Year Funding Traffic <br />Bridge Striping Drainage Retaining Total Source Counts <br />wall <br />Future 8,100 <br />$2,1 <br />$87 <br />Future <br />7,400 <br />3 of 5 7/17/2013 <br />Acorn Park Pedestrian Crossing <br />Construct a pedestrian refuge in center of street OR <br />$15,000 <br />$15,000 <br />Future <br />construct curb bump outs to increase safety <br />A light traffic overhead bridge structure across <br />26 <br />Rosedale to HarMar Connection <br />114.5 <br />Highway 36 and pathway connection between <br />1 <br />$370,000 <br />$1,600,000 <br />$175,000 <br />$2,145,000 <br />Future <br />41,000 <br />Rosedale and Har Mar Mall- cost does not include <br />potential right- of- way needed for construction <br />8 <br />Roselawn Ave <br />110 <br />On road and off -road pathways from west City <br />2.25 <br />$360,000 <br />$1,012,500 <br />$4,725 <br />$393,750 <br />$1,770,975 <br />Future <br />2,900 <br />boundary to Ham line Avenue <br />Off Road <br />There is already a off road facility in Falcon Heights <br />13,700 <br />in this corridor <br />Cty Boundary to Cleveland <br />6 ft wide concrete sidewalk- one side <br />0.75 <br />$337,500 <br />$131,250 <br />$25,875 <br />$494,625 <br />Cleveland to Fairview <br />6 ft wide concrete sidewalk- one side <br />0.5 <br />$225,000 <br />$87,500 <br />$17,250 <br />$329,750 <br />Fairview to Snelling <br />6 ft wide concrete sidewalk- one side <br />0.5 <br />$225,000 <br />$87,500 <br />$17,250 <br />$329,750 <br />Snelling to Hamline <br />6 ft wide concrete sidewalk- one side <br />0.5 <br />$225,000 <br />$87,500 <br />$17,250 <br />$329,750 <br />On Road <br />Difficult to construct without a full road project and <br />Falcon Heights cooperation <br />Cty Boundary to Cleveland <br />0.75 <br />$120,000 <br />$1,575 <br />$121,575 <br />Cleveland to Fairview <br />0.5 <br />$80,000 <br />$1,050 <br />$81,050 <br />Fairview to Snelling <br />0.5 <br />$80,000 <br />$1,050 <br />$81,050 <br />Snelling to Hamline <br />0.5 <br />$80,000 <br />$1,050 <br />$81,050 <br />Northeast Diagonal Trail Connection (Walnut <br />County Road C trail connection to the NE <br />25 <br />110 <br />Future <br />14,500 <br />to Co Rd C ) <br />Diagonal Trail into Minneapolis <br />Option 1- along County Road C/ Walnut <br />$343,636 <br />$125,284 <br />$12,633 <br />$481,553 <br />10 ft wide bituminous attached pathway south <br />0.55 <br />$263,636 <br />$96,117 <br />$12,633 <br />side County Road C <br />East side Walnut 8 ft bituminous <br />0.17 <br />$80,000 <br />$29,167 <br />Option 2 -Along the Railroad right- of -way <br />8 ft wide bituminous trail along tracks <br />0.87 <br />$348,485 <br />$152,462 <br />$500,947 <br />south of County Road C <br />Roselawn Avenue to Larpenteur Avenue <br />20 <br />Dale Street trail connection <br />109.7 <br />Future <br />9,500 <br />(requires easement purchase) <br />Combination of On Road and Off Road <br />$1,000 <br />$52,000 <br />$840 <br />$22,750 <br />$14,950 <br />$91,540 <br />Off Road <br />Extend Reservior Woods pathway through private <br />0.13 <br />$52,000 <br />$22,750 <br />$14,950 <br />$89,700 <br />property at 1893 Dale St to connect to Pineview Ct <br />On Road ( Pineview Ct and AltaVista Drive) <br />stripe a section of the road and designate for <br />0.4 <br />$1,000 <br />$840 <br />$1,840 <br />pedestrians - would require no parking on the road <br />8 foot wide bituminous trail from Reservoir <br />Off Road <br />Woods Park to Larpenteur Avenue (west side of <br />0.5 <br />$200,000 <br />$87,500 <br />$40,250 <br />$327,750 <br />Future <br />street <br />Work with Arden Hills to develop a regional <br />pathway connection along Snelling Avenue to Old <br />Snelling Avenue in Arden Hills connecting <br />13 <br />TH 51 pathway connection to Old Snelling <br />104 <br />Roseville to MoundsView High School, Valentine <br />0.5 <br />$200,000 <br />$87,500 <br />$17,250 <br />$304,750 <br />Future <br />31,000 <br />(Arden Hills) <br />Hills Elementary School, Bethel College, Lake <br />Johanna Park and County Road E2 commercial <br />businesses <br />3 of 5 7/17/2013 <br />