Laserfiche WebLink
Pathway Master Buildout Plan <br />Length <br />Estimated Cost <br />Funding <br />Traffic <br />Score <br />Description <br />(Miles) <br />Build Year <br />Source <br />Counts <br />Retaining <br />(Scoring per 2008 Pathway Master Plan) <br />On Road <br />Signage <br />Off Road <br />Bridge <br />Striping <br />Drainage <br />wall <br />Total <br />An off -road pathway from County Road B -2 to TH <br />14 <br />Ham line Ave <br />102.3 <br />51 (Snelling)- sidewalk exists on west side from <br />1.75 <br />$718,500 <br />$306,250 <br />$60,375 <br />$1,085,125 <br />Future <br />6,817 <br />County Road B -2 to County Road C <br />Off Road <br />County Road C2 to City Bdry <br />8 ft wide Bituminous Trail- one side <br />0.75 <br />$300,000 <br />$131,250 <br />$25,875 <br />$457,125 <br />County Road C to County Road C2 <br />8 ft wide Bituminous Trail- one side <br />0.5 <br />$200,000 <br />$87,500 <br />$17,250 <br />$304,750 <br />County Road B2 to County Road C <br />tear out sidewalk and construct 8 ft wide trail <br />0.5 <br />$218,500 <br />$87,500 <br />$17,250 <br />$323,250 <br />Pathway connection that creates a link between <br />3 <br />to County Road C2 Link <br />98.5 <br />the corner of Millwood and Chatsworth through <br />0.25 <br />$100,000 <br />$43,750 <br />$11,500 <br />$155,250 <br />2013 -2015 <br />NA <br />the Ramsey County open space to County Road <br />C2 <br />Pathway connection along Alta Vista Drive <br />34 <br />Alta Vista Drive <br />94.25 <br />between Larpenteur Avenue and Reservoir <br />Future <br />Unknown <br />Woods Park <br />Option 1: On Road <br />stripe a section of the road and designate for <br />0.45 <br />$1,125 <br />$945 <br />$2,070 <br />pedestrians - would require no parking on the road <br />Option 2: Off Road Sidewalk <br />6 ft wide sidewalk on one side of the road <br />0.45 <br />$202,500 <br />$78,750 <br />$31,050 <br />$312,300 <br />On and off road between Cleveland and Fairview <br />1 <br />County Road D <br />93.75 <br />Avenue- the road has shoulders, cost is for off <br />0.5 <br />$200,000 <br />$87,500 <br />$13,800 <br />$301,300 <br />Future <br />8,400 <br />road only <br />On and off road, between County Road C and <br />County Road D. On road is not recommended <br />10 <br />Cleveland Ave <br />92.75 <br />until road is reconstructed. Segment has a <br />0.85 <br />$382,500 <br />$148,750 <br />$23,460 <br />$554,710 <br />Future <br />6,700 <br />pathway on the west side from just north of the <br />35W ramps all the way to County Road D (around <br />Centre Pointe <br />Wal Mart is constructing a sidewalk on the east side <br />Off road <br />from County Road C to Twin Lakes Parkway so the <br />segment is not included <br />Twin Lakes Parkway to County Road C2 <br />6 ft wide sidewalk <br />0.4 <br />$180,000 <br />$70,000 <br />$11,040 <br />$261,040 <br />Count Road C2 to Count Road D <br />6 ft wide sidewalk- alread at A lewood <br />0.45 <br />$202,500 <br />$78,750 <br />$12,420 <br />$293,670 <br />F9TLarpenteurAve <br />925 <br />1 An off-road rai from Reservoir Woods to Galtier <br />0.5 <br />$225,000 <br />$87,500 <br />$13,800 <br />$326,300 <br />Future <br />12,800 <br />4 of 5 7/17/2013 <br />