Laserfiche WebLink
Pathway Master Buildout Plan <br />Length <br />Estimated Cost <br />Funding <br />Traffic <br />Score <br />Description <br />(Miles) <br />Build Year <br />Source <br />Counts <br />Retaining <br />(Scoring per 2008 Pathway Master Plan) <br />On Road <br />Signage <br />Off Road <br />Bridge <br />Striping <br />Drainage <br />wall <br />Total <br />SEGMENTS <br />WITH SCORES LESS THAN 90 <br />33 <br />Cohansey St to HANG Connection <br />89.5 <br />Fatnway connection between Cohansey Street <br />and HANG <br />Additional Discussion <br />Future <br />NA <br />30 <br />Villa Park Connections <br />88.75 <br />Pathway connection from Shryer Ave and from <br />Not Feasible to construct an ADA compliant pathway without removing significant vegetation <br />Future <br />NA <br />Ran Ave into Villa Park <br />On and off road pathways from the west City <br />Boundary to Snelling Avenue This corridor would <br />2 <br />County Road C2 (W of Snelling) <br />87 <br />include a grade separated crossing of 35W. Items <br />Future <br />2,300 <br />marked with a ( *) are needed for both on road and <br />off road connection <br />Off Road <br />1 <br />$825 <br />$742,500 <br />$1,675,000 <br />$693 <br />$288,750 <br />$113,850 <br />$2,821,618 <br />Lincoln Dr to Wheeler (around the south side of <br />Box Culvert with 8 foot wide bituminous trail <br />0.32 <br />$144,000 <br />$75,000 <br />$56,000 <br />$22,080 <br />$297,080 <br />Oasis Pond) <br />connecting to existing park trail <br />Wheeler to Fairview <br />si na a and striping along the route <br />0.13 <br />$325 <br />$273 <br />$598 <br />Fairviewto Langton Lake Park <br />si na e and striping along the route <br />0.2 <br />$500 <br />$420 <br />$920 <br />Langton Lake Park to Cleveland <br />6 ft wide sidewalk along one side of the road <br />0.45 <br />$202,500 <br />$78,750 <br />$31,050 <br />$312,300 <br />Centre Pointe Drive to Long Lake Road <br />Pedestrian Bridge with 8 ft wide pathway <br />0.13 <br />$58,500 <br />$1,600,000 <br />$22,750 <br />$8,970 <br />$1,690,220 <br />Long Lake Road to Long Lake Road <br />6 ft wide sidewalk along one side of the road <br />0.25 <br />$112,500 <br />$43,750 <br />$17,250 <br />$173,500 <br />Long Lake Road to Highway 88 <br />6 ft wide sidewalk along one side of the road <br />0.3 <br />$135,000 <br />$52,500 <br />$20,700 <br />$208,200 <br />Highway 88 to Hi hcrest <br />6 ft wide sidewalk along one side of the road <br />0.2 <br />$90,0001 <br />$35,000 <br />$13,800 <br />$138,800 <br />On Road <br />$8,650 <br />$202,500 <br />$1,675,000 <br />$3,990 <br />$78,750 <br />$31,050 <br />$1,999,940 <br />Lincoln Dr to Wheeler (around the south side of <br />Box Culvert with 8 foot wide bituminous trail <br />0.32 <br />$144,000 <br />$75,000 <br />$56,000 <br />$22,080 <br />$297,080 <br />Oasis Pond <br />to existing ark trail <br />Wheeler to Fairview <br />_connecting <br />share the road <br />0.13 <br />$650 <br />$650 <br />Fairviewto Langton Lake Park <br />share the road <br />0.2 <br />$1,000 <br />$1,000 <br />Langton Lake Park to Cleveland <br />share the road <br />0.45 <br />$2,250 <br />$2,250 <br />Centre Pointe Drive to Long Lake Road <br />Pedestrian Bridge with 8 ft wide pathway <br />0.13 <br />$58,500 <br />$1,600,000 <br />$22,750 <br />$8,970 <br />$1,690,220 <br />Long Lake Road to Long Lake Road <br />stripe shoulders on road <br />0.25 <br />$1,250 <br />$1,050 <br />$2,300 <br />Lon Lake Road to Highway 88 <br />stri a shoulders on road <br />0.5 <br />$2,500 <br />$2,100 <br />$4,600 <br />Highway 88 to Hi hcrest <br />I stripe shoulders on road <br />0.2 <br />$1,000 <br />$840 <br />$1,840 <br />3 <br />County Road C2 (E of Snelling) <br />86 <br />On and off road pathways from the Snelling <br />$450,000 <br />$175,000 <br />$69,000 <br />$694,000 <br />Future <br />2,350 <br />Avenue to Victoria Street <br />Off Road <br />Snelling to Hamline <br />6 ft wide sidewalk on one side of the road <br />0.5 <br />$225,000 <br />$87,500 <br />$34,500 <br />$347,000 <br />Lexington to Victoria <br />6 ft wide sidewalk on one side of the road <br />0.5 <br />$225000 <br />$87500 <br />$34,500 <br />$347,000 <br />29 <br />Lovell to Minnesota Connection <br />80.25 <br />Hatrway connection between Lovell Ave and <br />0.1 <br />$45,000 <br />$17,500 <br />$6,900 <br />$69,400 <br />Future <br />NA <br />27 <br />Heinel Drive Connection <br />75.5 <br />Pathway connection between S Owasso Blvd and <br />$1,375 <br />$157,500 <br />$1,155 <br />$61,250 <br />$24,150 <br />$245,430 <br />Future <br />NA <br />County Road C along Heinel Drive <br />On Road- Heinel Drive <br />signage and striping along the route <br />0.55 <br />$1,375 <br />$1,155 <br />$2,530 <br />Pathway <br />Construct 8 ft wide pathway adjacent to Railroad <br />0.35 <br />$157,500 <br />$61,250 <br />$24,150 <br />$242,900 <br />tracks connectin to Victoria Street <br />28 <br />Judith to Iona Connection <br />72.75 <br />a way connec ion a ween u i ve an ona <br />0.1 <br />$40,000 <br />$17,500 <br />$5,750 <br />$63,250 <br />Future <br />Pernewal s <br />NA <br />23 <br />Langton Lake Loop <br />72.5 <br />Pathway that goes around all of Langton Lake <br />Future <br />NA <br />On Road <br />0.4 <br />$1,000 <br />$840 <br />$1,840 <br />On and off road facilities as a part of public street <br />infrastructure project within Twin Lakes <br />Developer/ <br />24 <br />Twin Lakes Redevelopment Area Connections <br />56.75 <br />Redevelopment area (between Fairview and <br />no estimate- will be constructed as a part of development <br />Future <br />TIF /Assess <br />NA <br />Cleveland) Provide connection from the <br />redevelopment area into Langton Lake Park <br />32 <br />Eustis to St Croix Connection <br />49 <br />Pathway connection between Eustis Street and St <br />0.2 <br />$80,000 <br />$13,800 <br />$93,800 <br />Future <br />NA <br />5 of 5 7/17/2013 <br />