Pathway Master Buildout Plan
<br />Acorn Park Pedestrian Crossing
<br />Construct a pedestrian refuge in center of street OR
<br />Estimated Cost
<br />$15,000
<br />Length
<br />$15,000
<br />Future
<br />Funding
<br />Traffic
<br />Score
<br />Description
<br />(Miles)
<br />Build Year
<br />Source
<br />Counts
<br />Retaining
<br />(Scoring per 2008 Pathway Master Plan
<br />On Road
<br />Signage
<br />Off Road
<br />Bridge
<br />Striping
<br />Drainage
<br />wall
<br />Total
<br />11
<br />Fairview Ave (North of C)
<br />118.5
<br />On -road and off -road pathways between County
<br />1
<br />Highway 36 and pathway connection between
<br />1
<br />$370,000
<br />$1,600,000
<br />$175,000
<br />Future
<br />$2,145,000
<br />8,100
<br />41,000
<br />Road B2 and County Road D
<br />On road exists with shoulders today- cost is for
<br />Rosedale and Har Mar Mall- cost does not include
<br />On Road
<br />1
<br />$2,500
<br />$2,100
<br />$4,600
<br />paint and signs
<br />Roselawn Ave
<br />110
<br />On road and off -road pathways from west City
<br />2.25
<br />$360,000
<br />$1,012,500
<br />$4,725
<br />$393,750
<br />$1,770,975
<br />Future
<br />Off Road
<br />2,900
<br />boundary to Hamline Avenue
<br />$200,000
<br />$87,500
<br />$28,750
<br />$316,250
<br />13,700
<br />County Road C2 to County Road D
<br />8 ft wide Bituminous Pathway- one side
<br />0.5
<br />There is already a off road facility in Falcon Heights
<br />$200,000
<br />$87,500
<br />$28,750
<br />$316,250
<br />5
<br />County Road C Sidewalk
<br />117.5
<br />Sidewalk on the north side of County Road C
<br />0.5
<br />in this corridor
<br />$225,000
<br />$87,500
<br />$23,000
<br />$335,500
<br />Future
<br />7,400
<br />from Western to Rice Street
<br />Cty Boundary to Cleveland
<br />6 ft wide concrete sidewalk- one side
<br />0.75
<br />$337,500
<br />$131,250
<br />$25,875
<br />$494,625
<br />2 of 4 8/22/2013
<br />Acorn Park Pedestrian Crossing
<br />Construct a pedestrian refuge in center of street OR
<br />$15,000
<br />$15,000
<br />Future
<br />construct curb bump outs to increase safety
<br />A light traffic overhead bridge structure across
<br />26
<br />Rosedale to HarMar Connection
<br />114.5
<br />Highway 36 and pathway connection between
<br />1
<br />$370,000
<br />$1,600,000
<br />$175,000
<br />$2,145,000
<br />Future
<br />41,000
<br />Rosedale and Har Mar Mall- cost does not include
<br />potential right- of- way needed for construction
<br />8
<br />Roselawn Ave
<br />110
<br />On road and off -road pathways from west City
<br />2.25
<br />$360,000
<br />$1,012,500
<br />$4,725
<br />$393,750
<br />$1,770,975
<br />Future
<br />2,900
<br />boundary to Hamline Avenue
<br />Off Road
<br />There is already a off road facility in Falcon Heights
<br />13,700
<br />in this corridor
<br />Cty Boundary to Cleveland
<br />6 ft wide concrete sidewalk- one side
<br />0.75
<br />$337,500
<br />$131,250
<br />$25,875
<br />$494,625
<br />Cleveland to Fairview
<br />6 ft wide concrete sidewalk- one side
<br />0.5
<br />$225,000
<br />$87,500
<br />$17,250
<br />$329,750
<br />Fairview to Snelling
<br />6 ft wide concrete sidewalk- one side
<br />0.5
<br />$225,000
<br />$87,500
<br />$17,250
<br />$329,750
<br />Snelling to Hamline
<br />6 ft wide concrete sidewalk- one side
<br />0.5
<br />$225,000
<br />$87,500
<br />$17,250
<br />$329,750
<br />On Road
<br />Difficult to construct without a full road project and
<br />Falcon Heights cooperation
<br />Cty Boundary to Cleveland
<br />0.75
<br />$120,000
<br />$1,575
<br />$121,575
<br />Cleveland to Fairview
<br />0.5
<br />$80,000
<br />$1,050
<br />1 1 2 50
<br />41
<br />Fairview to Snellin
<br />0.5
<br />$80,000
<br />$1,050
<br />$81,050
<br />Snelling to Hamline
<br />0.5
<br />$80,0001
<br />1 050
<br />$1,05201
<br />$81,0501
<br />25
<br />Northeast Diagonal Trail Connection (Walnut
<br />110
<br />County Road C trail connection to the NE
<br />Future
<br />14,500
<br />to Co Rd C)
<br />Diagonal Trail into Minneapolis
<br />Option 1- along County Road C/ Walnut
<br />$343,636
<br />$125,284
<br />$12,633
<br />$481,553
<br />10 ft wide bituminous attached pathway south
<br />0.55
<br />$263,636
<br />$96,117
<br />$12,633
<br />side County Road C
<br />East side Walnut 8 ft bituminous
<br />0.17
<br />$80,000
<br />$29,167
<br />Option 2 -Along the Railroad right- of- way
<br />8 ft wide bituminous trail along tracks
<br />0.87
<br />$348,485
<br />$152,462
<br />$500,947
<br />south of County Road C
<br />20
<br />Dale Street trail connection
<br />109.7
<br />Roselawn Avenue to Larpenteur Avenue
<br />Future
<br />9,500
<br />(requires easement purchase)
<br />Combination of On Road and Off Road
<br />$1,000
<br />$52,000
<br />$840
<br />$22,750
<br />$14,950
<br />$91,540
<br />Off Road
<br />Extend Reservior Woods pathway through private
<br />0.13
<br />$52,000
<br />$22,750
<br />$14,950
<br />$89,700
<br />property at 1893 Dale St to connect to Pineview Ct
<br />On Road ( Pineview Ct and AltaVista Drive)
<br />stripe a section of the road and designate for
<br />0.4
<br />$1,000
<br />$840
<br />$1,840
<br />pedestrians - would require no parking on the road
<br />8 foot wide bituminous trail from Reservoir
<br />Off Road
<br />Woods Park to Larpenteur Avenue (west side of
<br />0.5
<br />$200,000
<br />$87,500
<br />$40,250
<br />$327,750
<br />Future
<br />street
<br />Work with Arden Hills to develop a regional
<br />pathway connection along Snelling Avenue to Old
<br />TH 51 pathway connection to Old Snelling
<br />Snelling Avenue in Arden Hills connecting
<br />13
<br />104
<br />Roseville to MoundsView High School, Valentine
<br />0.5
<br />$200,000
<br />$87,500
<br />$17,250
<br />$304,750
<br />Future
<br />31,000
<br />(Arden Hills)
<br />Hills Elementary School, Bethel College, Lake
<br />Johanna Park and County Road E2 commercial
<br />businesses
<br />2 of 4 8/22/2013
<br />
|