Pathway Master Buildout Plan
<br />Estimated Cost
<br />Length
<br />Funding
<br />Traffic
<br />Score
<br />Description
<br />(Miles)
<br />Build Year
<br />Source
<br />Counts
<br />Retaining
<br />(Scoring per 2008 Pathway Master Plan
<br />On Road
<br />Signage
<br />Off Road
<br />Bridge
<br />Striping
<br />Drainage
<br />wall
<br />Total
<br />An off -road pathway from County Road B -2 to TH
<br />14
<br />Hamline Ave
<br />102.3
<br />51 (Snelling)- sidewalk exists on west side from
<br />1.75
<br />$718,500
<br />$306,250
<br />$60,375
<br />$1,085,125
<br />Future
<br />6,817
<br />County Road B -2 to County Road C
<br />Off Road
<br />County Road C2 to City Bdry
<br />8 ft wide Bituminous Trail- one side
<br />0.75
<br />$300,000
<br />$131,250
<br />$251875
<br />$457,125
<br />Count Road C to Count Road C2
<br />8 ft wide Bituminous Trail- one side
<br />0.5
<br />$200,000
<br />$87,500
<br />$ 17,2501
<br />$304,750
<br />County Road B2 to County Road Cl
<br />tear out sidewalk and construct 8 ft wide trail
<br />1 0.5
<br />1
<br />1
<br />1 $218,5001
<br />$87,5001
<br />$17,2501
<br />$323,2501
<br />Pathway connection that creates a link between
<br />31
<br />Millwood to County Road C2 Link
<br />98.5
<br />the corner of Millwood and Chatsworth through
<br />0.25
<br />$100,000
<br />$43,750
<br />$11,500
<br />$155,250
<br />2013 -2015
<br />NA
<br />the Ramsey County open space to County Road
<br />C2
<br />Pathway connection along Alta Vista Drive
<br />34
<br />Alta Vista Drive
<br />94.25
<br />between Larpenteur Avenue and Reservoir
<br />Future
<br />Unknown
<br />Woods Park
<br />Option 1: On Road
<br />stripe a section of the road and designate for
<br />0.45
<br />$1,125
<br />$945
<br />$2,070
<br />pedestrians - would require no parking on the road
<br />Option 2: Off Road Sidewalk
<br />6 ft wide sidewalk on one side of the road
<br />0.45
<br />$202500
<br />$78750
<br />$31,050
<br />$312,300
<br />On and off road between Cleveland and Fairview
<br />1
<br />County Road D
<br />93.75
<br />Avenue- the road has shoulders, cost is for off
<br />0.5
<br />$200,000
<br />$87,500
<br />$13,800
<br />$301,300
<br />Future
<br />8,400
<br />road only
<br />On and off road, between County Road C and
<br />County Road D. On road is not recommended
<br />10
<br />Cleveland Ave
<br />92.75
<br />until road is reconstructed. Segment has a
<br />0.85
<br />$382,500
<br />$148,750
<br />$23,460
<br />$554,710
<br />Future
<br />6,700
<br />pathway on the west side from just north of the
<br />35W ramps all the way to County Road D (around
<br />Centre Pointe
<br />Wal Mart is constructing a sidewalk on the east side
<br />Off road
<br />from County Road C to Twin Lakes Parkway so the
<br />segment is not included
<br />Twin Lakes Parkway to County Road C2
<br />6 ft wide sidewalk
<br />0.4
<br />$180,000
<br />$70,000
<br />$11,040
<br />$261,040
<br />Count Road C2 to Count Road D
<br />6 ft wide sidewalk- alread at A lewood
<br />0.45
<br />$202 500
<br />$78 750
<br />$12,420
<br />$293,670
<br />9
<br />LarpenteurAve
<br />925
<br />An off-road trail from eservoir oo s o a ier
<br />0.5
<br />$225,000
<br />$87,500
<br />$13,800
<br />$326,300
<br />Future
<br />12,800
<br />3 of 4 8/22/2013
<br />
|