Pathway Master Buildout Plan
<br />Estimated Cost
<br />Length
<br />Funding
<br />Traffic
<br />Score
<br />Description
<br />(Miles)
<br />Build Year
<br />Source
<br />Counts
<br />Retaining
<br />(Scoring per 2008 Pathway Master Plan)
<br />On Road
<br />Signage
<br />Off Road
<br />Bridge
<br />Striping
<br />Drainage
<br />wall
<br />Total
<br />81
<br />Cleveland to Fairview
<br />6 ft wide concrete sidewalk- one side
<br />0.5
<br />$225,000
<br />$87,500
<br />$17,250
<br />$329,750
<br />8
<br />Fairview to Snelling
<br />6 ft wide concrete sidewalk- one side
<br />0.5
<br />$225,000
<br />$87,500
<br />$17,250
<br />$329,750
<br />8
<br />Snelling to Hamline
<br />6 ft wide concrete sidewalk- one side
<br />0.5
<br />$225,000
<br />$87,500
<br />$17,250
<br />$329,750
<br />8
<br />On Road
<br />Difficult to construct without a full road project and
<br />Falcon Heights cooperation
<br />8
<br />Cty Boundary to Cleveland
<br />0.75
<br />$120,000
<br />$1,575
<br />$121,575
<br />8
<br />Cleveland to Fairview
<br />0.5
<br />$80,000
<br />$1,050
<br />$81,050
<br />8
<br />Fairview to Snelling
<br />0.5
<br />$80,000
<br />$1,050
<br />$81,050
<br />8
<br />Snelling to Hamline
<br />0.5
<br />$80,000
<br />$1,050
<br />$81,050
<br />9
<br />Larpenteur Ave
<br />925
<br />An off -road trail from Reservoir Woods to Galtier
<br />0.5
<br />$225,000
<br />$87,500
<br />$13,800
<br />$326,300
<br />Future
<br />12,800
<br />Street- 6 ft concrete sidewalk
<br />On and off road, between County Road C and
<br />County Road D. On road is not recommended
<br />10
<br />Cleveland Ave
<br />9275
<br />until road is reconstructed. Segment has a
<br />0.85
<br />$382,500
<br />$148,750
<br />$23,460
<br />$554,710
<br />Future
<br />6,700
<br />pathway on the west side from just north of the
<br />35W ramps all the way to County Road D (around
<br />Centre Pointe
<br />Wal Mart is constructing a sidewalk on the east side
<br />10
<br />Off road
<br />from County Road C to Twin Lakes Parkway so the
<br />segment is not included
<br />10
<br />Twin Lakes Parkway to County Road C2
<br />6 ft wide sidewalk
<br />0.4
<br />$180,000
<br />$70,000
<br />$11,040
<br />$261,040
<br />10
<br />County Road C2 to County Road D
<br />6 ft wide sidewalk- already at Applewood
<br />0.45
<br />$202,500
<br />$78,750
<br />$12,420
<br />$293,670
<br />11
<br />Fairview Ave (North of C)
<br />118.5
<br />On -road and off -road pathways between County
<br />1
<br />Future
<br />8,100
<br />Road B2 and County Road D
<br />11
<br />On Road
<br />On road exists with shoulders today- cost is for
<br />1
<br />$2,500
<br />$2,100
<br />$4,600
<br />aint and si ns
<br />11
<br />Off Road
<br />$200,000
<br />$87,500
<br />$28,750
<br />$316,250
<br />13,700
<br />11
<br />County Road C2 to County Road D
<br />8 ft wide Bituminous Pathway- one side
<br />0.5
<br />$200,000
<br />$87,500
<br />$28,750
<br />$316,250
<br />Work with Arden Hills to develop a regional
<br />pathway connection along Snelling Avenue to Old
<br />Snelling Avenue in Arden Hills connecting
<br />13
<br />TH 51 pathway connection to Old Snelling
<br />104
<br />Roseville to MoundsView High School, Valentine
<br />0.5
<br />$200,000
<br />$87,500
<br />$17,250
<br />$304,750
<br />Future
<br />31,000
<br />(Arden Hills)
<br />Hills Elementary School, Bethel College, Lake
<br />Johanna Park and County Road E2 commercial
<br />businesses
<br />An off -road pathway from County Road B -2 to TH
<br />14
<br />Hamline Ave
<br />102.3
<br />51 (Snelling)- sidewalk exists on west side from
<br />1.75
<br />$718,500
<br />$306,250
<br />$60,375
<br />$1,085,125
<br />Future
<br />6,817
<br />County Road B -2 to County Road C
<br />14
<br />Off Road
<br />14
<br />County Road C2 to City Bdry
<br />8 ft wide Bituminous Trail- one side
<br />0.75
<br />$300,000
<br />$131,250
<br />$25,875
<br />$457,125
<br />14
<br />County Road C to County Road C2
<br />8 ft wide Bituminous Trail- one side
<br />0.5
<br />$200,000
<br />$87,500
<br />$17,250
<br />$304,750
<br />14
<br />County Road B2 to County Road C
<br />tear out sidewalk and construct 8 ft wide trail
<br />0.5
<br />$218,500
<br />$87,500
<br />$17,250
<br />$323,250
<br />Off -road trail on the east side of Lexington
<br />15
<br />Lexington Ave
<br />120.5
<br />Avenue from Larpenteur Avenue north through
<br />3
<br />$1,140,000
<br />$498,750
<br />$98,325
<br />$1,737,075
<br />Future
<br />15,100
<br />the City connecting to Shoreview's pathway
<br />s stem
<br />15
<br />Count Road C2 to Count Road D
<br />8 ft wide Bituminous Pathway- east side
<br />0.5
<br />$200,000
<br />$87,500
<br />$17,250
<br />$304,750
<br />15
<br />Count Road C to Count Road C2
<br />8 ft wide Bituminous Pathway- east side
<br />0.5
<br />$200,000
<br />$87,500
<br />$17,250
<br />$304,750
<br />151
<br />County Road B2 to County Road C
<br />8 ft wide Bituminous Pathway- east side
<br />0.35
<br />$140,000
<br />1 $61,250
<br />$12,0751
<br />$213,325
<br />151
<br />County Road B to County Road B2
<br />8 ft wide Bituminous Pathway- east side
<br />0.5
<br />$200,000
<br />1
<br />1 $87,500
<br />$17,2501
<br />$304,7501
<br />1
<br />2 of 4 8/22/2013
<br />
|