Attachment B
<br />Pathway Master Buildout Plan
<br />Estimated Cost
<br />Length
<br />Funding
<br />Traffic
<br />Score
<br />Description
<br />(Miles)
<br />Build Year
<br />Source
<br />Counts
<br />Retaining
<br />(Scoring per 2008 Pathway Master Plan)
<br />On Road
<br />Signage
<br />Off Road
<br />Bridge
<br />Striping
<br />Drainage
<br />wall
<br />Total
<br />On and off road between Cleveland and Fairview
<br />1
<br />County Road D
<br />93.75
<br />Avenue- the road has shoulders, cost is for off
<br />0.5
<br />$200,000
<br />$87,500
<br />$13,800
<br />$301,300
<br />Future
<br />8,400
<br />road only
<br />On and off road pathways from the west City
<br />Boundary to Snelling Avenue This corridor would
<br />2
<br />County Road C2 (W of Snelling)
<br />87
<br />include a grade separated crossing of 35W. Items
<br />Future
<br />2,300
<br />marked with a ( *) are needed for both on road and
<br />off road connection
<br />2
<br />Off Road
<br />$825
<br />$742,500
<br />$1,675,000
<br />$693
<br />$288,750
<br />$113,850
<br />$2,821,618
<br />2
<br />Lincoln Dr to Wheeler (around the south side of
<br />Box Culvert with 8 foot wide bituminous trail
<br />0.32
<br />$144,000
<br />$75,000
<br />$56,000
<br />$22,080
<br />$297,080
<br />Oasis Pond)
<br />connecting to existing park trail
<br />2
<br />Wheeler to Fairview
<br />signage and striping along the route
<br />0.13
<br />$325
<br />$273
<br />$598
<br />2
<br />Fairview to Langton Lake Park
<br />si na e and striping along the route
<br />0.2
<br />$500
<br />$420
<br />$920
<br />2
<br />Langton Lake Park to Cleveland
<br />6 ft wide sidewalk along one side of the road
<br />0.45
<br />$202,500
<br />$78,750
<br />$31,050
<br />$312,300
<br />2
<br />Centre Pointe Drive to Long Lake Road
<br />Pedestrian Bridge with 8 ft wide pathway
<br />0.13
<br />$58,500
<br />$1,600,000
<br />$22,750
<br />$8,970
<br />$1,690,220
<br />2
<br />Long Lake Road to Long Lake Road
<br />16 ft wide sidewalk along one side of the road
<br />0.25
<br />$112,500
<br />$43,750
<br />$17,250
<br />$173,500
<br />2
<br />Long Lake Road to Highway 88
<br />6 ft wide sidewalk along one side of the road
<br />0.3
<br />$135,000
<br />$52,5001
<br />$20,700
<br />$208,2001
<br />1
<br />2
<br />Highway 88 to Highcrest
<br />6 ft wide sidewalk along one side of the road
<br />0.2
<br />$90,000
<br />$35,000
<br />$13,800
<br />$138,800
<br />2
<br />On Road
<br />$8,650
<br />$202,500
<br />$1,675,000
<br />$3,990
<br />$78,750
<br />$31,050
<br />$947,130
<br />2
<br />Lincoln Dr to Wheeler (around the south side of
<br />Box Culvert with 8 foot wide bituminous trail
<br />0.32
<br />$144,000
<br />$75,000
<br />$56,000
<br />$22,080
<br />$297,080
<br />Oasis Pond)
<br />connecting to existing park trail
<br />2
<br />Wheeler to Fairview
<br />share the road
<br />0.13
<br />$650
<br />$650
<br />2
<br />Fairview to Langton Lake Park
<br />share the road
<br />0.2
<br />$1,000
<br />$1,000
<br />2
<br />Langton Lake Park to Cleveland
<br />share the road
<br />0.45
<br />$2,250
<br />$2,250
<br />2
<br />Centre Pointe Drive to Long Lake Road
<br />Pedestrian Bridge with 8 ft wide pathway
<br />0.13
<br />$58,500
<br />$1,600,000
<br />$22,750
<br />$8,9701
<br />$1,690,220
<br />2
<br />Long Lake Road to Long Lake Road
<br />stripe shoulders on road
<br />0.25
<br />$1,250
<br />$1,050
<br />$2,300
<br />2
<br />Long Lake Road to Highway 88
<br />stripe shoulders on road
<br />0.5
<br />$2,500
<br />$2,100
<br />$4,600
<br />21
<br />Highway 88 to Hi hcrest
<br />stripe shoulders on road
<br />0.2
<br />$1,000
<br />$840
<br />$1,840
<br />2
<br />3
<br />County Road C2 (E of Snelling)
<br />86
<br />On and off road pathways from the Snelling
<br />$450,000
<br />$175,000
<br />$69,000
<br />$694,000
<br />Future
<br />2,350
<br />Avenue to Victoria Street
<br />3
<br />Off Road
<br />3
<br />Snelling to Hamline
<br />6 ft wide sidewalk on one side of the road
<br />0.5
<br />$225,000
<br />$87,500
<br />$34,500
<br />$347,000
<br />3
<br />Lexington to Victoria
<br />6 ft wide sidewalk on one side of the road
<br />0.5
<br />$225,000
<br />$87,500
<br />$34,500
<br />$347,000
<br />On -road bicycle facility from Lexington Avenue to
<br />4
<br />County Road C- On Road
<br />128
<br />2
<br />Future
<br />8,250
<br />Rice Street
<br />4
<br />Restripe
<br />work with Ramsey County on restriping the road to a
<br />2
<br />$5,000
<br />$9,700
<br />$14,700
<br />3 lane configureation
<br />5
<br />County Road C Sidewalk
<br />117.5
<br />Sidewalk on the north side of County Road C
<br />0.5
<br />$225,000
<br />$87,500
<br />$23,000
<br />$335,500
<br />Future
<br />7,400
<br />from Western to Rice Street
<br />5
<br />Acorn Park Pedestrian Crossing
<br />Construct a pedestrian refuge in center of street OR
<br />$15,000
<br />$15,000
<br />Future
<br />construct curb bump outs to increase safety
<br />Off -road trail connection from Highway 280 to
<br />7
<br />County Road B
<br />130
<br />Rice Street- only missing segment is TH 280 to
<br />1
<br />$370,000
<br />$175,000
<br />$34,500
<br />$579,500
<br />2015 -2020
<br />1,300
<br />Cleveland
<br />7
<br />Widen street for an on -road facility
<br />1
<br />$160,000
<br />$2,500
<br />$2,100
<br />$175,000
<br />$339,600
<br />8
<br />Roselawn Ave
<br />110
<br />On road and off -road pathways from west City
<br />2.25
<br />$360,000
<br />$1,012,500
<br />$4,725
<br />$393,750
<br />$1,770,975
<br />Future
<br />2,900
<br />boundary to Hamline Avenue
<br />8
<br />Off Road
<br />There is already a off road facility in Falcon Heights
<br />13,700
<br />in this corridor
<br />8
<br />Cty Boundary to Cleveland
<br />6 ft wide concrete sidewalk- one side
<br />1 0.75
<br />1
<br />$337,5001
<br />1
<br />1 $131,250
<br />$25,875
<br />$494,625
<br />1 of 4 8/22/2013