My WebLink
|
Help
|
About
|
Sign Out
Home
2013-08-27_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2013
>
2013-08-27_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2013 1:47:03 PM
Creation date
8/22/2013 3:03:23 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
8/27/2013
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
125 2' of each other; retention of clear zones (e.g. 6' sidewalk with 2' clear zone) for <br />126 parking and /or snow plowing purposes. <br />127 <br />128 Additional discussion included testing by staff of current storm sewer capacity in <br />129 conjunction with this project now that a realistic alignment had been completed as <br />130 part of the preliminary design work; where additional structures and BMP's were <br />131 indicated and sizing of pipes to reduce volume and assist pipe capacity through <br />132 use of BMP's where applicable. <br />133 <br />134 At the request of Member Stenlund, Ms. Bloom advised that discussion would be <br />135 held regarding the potential use of pervious concrete or porous bituminous, use of <br />136 infiltration BMP's depending on soil conditions in particular areas; but depending <br />137 to a great degree on cost comparisons for that newer technology. <br />138 <br />Page 4 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.