Laserfiche WebLink
<br />1. The maximum height above grade at the monopole base shall be 67 feet. One <br />antenna at the size specified in the application may be installed on the <br />monopole. <br /> <br />2. A prefabricated set of equipment cabinets may be installed near the base of <br />the monopole. All utility wires or lines leading to the monopole shall be <br />buried. <br /> <br />3. The area surrounding the ground equipment should be used to screen the <br />equipment cabinets from view. Specifically, plant material should be installed <br />on the north, west, and south sides of the equipment area having a minimum <br />height of five feet (except accent shrubs); 75% of this plant screen should be <br />coniferous. A complete landscape plan must be prepared as part of the <br />building permit application and approved by the City prior to issuance ofthe <br />building permit. <br /> <br />4. The monopole is to be limited to the single user/applicant (US West <br />Wireless). Future antenna additions will require a revised CUP. <br /> <br />5. The monopole shall not be lighted. Electric and phone wires serving the <br />equipment and monopole shall be buried. The reinstalled parking lot light <br />shall serve as security lighting. <br /> <br />6. The 67 foot tall monopole and supporting equipment shall be completely <br />removed from the site by the applicant (US West Wireless) after operations <br />cease; the equipment is damaged or unsafe as determined by the Roseville <br />Building Official; the CUP elapses or is determined to be in violation by the <br />Community Development Director. The City may require the applicant (US <br />West Wireless) to post a bond to assure timely removal of the monopole and <br />supporting equipment. <br /> <br />7. Parking of maintenance vehicles shall occur in an off-street parking space <br />directly adjacent to the monopole location. <br /> <br />8. The color of the supporting equipment cabinets shall be of a similar color to <br />that of the principal structure. <br /> <br />9. Prior to issuance of a building permit, and within 60 days after approval of the <br />conditional use permit, the applicant must record the conditional use permit <br />with the Ramsey County Recorder. <br /> <br />10. This conditional use permit shall expire 6 months after approval if a building <br />permit has not been issued. (Section 1013.03) <br /> <br />3 <br />