Laserfiche WebLink
Attachment B <br />Pathway Master Buildout Plan <br />Length <br />Estimated Cost <br />Funding <br />Traffic <br />Score <br />Description <br />(Miles) <br />Build Year <br />Source <br />Counts <br />Retaining <br />(Scoring per 2008 Pathway Master Plan) <br />On Road <br />Signage <br />Off Road <br />Bridge <br />Striping <br />Drainage <br />wall <br />Total <br />On and off road between Cleveland and Fairview <br />1 <br />County Road D <br />93.75 <br />Avenue- the road has shoulders, cost is for off <br />0.5 <br />$200,000 <br />$87,500 <br />$13,800 <br />$301,300 <br />Future <br />8,400 <br />road only <br />On and off road pathways from the west City <br />Boundary to Snelling Avenue This corridor would <br />2 <br />County Road C2 (W of Snelling) <br />87 <br />include a grade separated crossing of 35W. Items <br />Future <br />2,300 <br />marked with a ( *) are needed for both on road and <br />off road connection <br />2 <br />Off Road <br />$825 <br />$742,500 <br />$1,675,000 <br />$693 <br />$288,750 <br />$113,850 <br />$2,821,618 <br />2 <br />Lincoln Dr to Wheeler (around the south side of <br />Box Culvert with 8 foot wide bituminous trail <br />0.32 <br />$144,000 <br />$75,000 <br />$56,000 <br />$22,080 <br />$297,080 <br />Oasis Pond) <br />connecting to existing park trail <br />2 <br />Wheeler to Fairview <br />signage and striping along the route <br />0.13 <br />$325 <br />$273 <br />$598 <br />2 <br />Fairview to Langton Lake Park <br />si na e and striping along the route <br />0.2 <br />$500 <br />$420 <br />$920 <br />2 <br />Langton Lake Park to Cleveland <br />6 ft wide sidewalk along one side of the road <br />0.45 <br />$202,500 <br />$78,750 <br />$31,050 <br />$312,300 <br />2 <br />Centre Pointe Drive to Long Lake Road <br />Pedestrian Bridge with 8 ft wide pathway <br />0.13 <br />$58,500 <br />$1,600,000 <br />$22,750 <br />$8,970 <br />$1,690,220 <br />2 <br />Long Lake Road to Long Lake Road <br />16 ft wide sidewalk along one side of the road <br />0.25 <br />$112,500 <br />$43,750 <br />$17,250 <br />$173,500 <br />2 <br />Long Lake Road to Highway 88 <br />6 ft wide sidewalk along one side of the road <br />0.3 <br />$135,000 <br />$52,5001 <br />$20,700 <br />$208,2001 <br />1 <br />2 <br />Highway 88 to Highcrest <br />6 ft wide sidewalk along one side of the road <br />0.2 <br />$90,000 <br />$35,000 <br />$13,800 <br />$138,800 <br />2 <br />On Road <br />$8,650 <br />$202,500 <br />$1,675,000 <br />$3,990 <br />$78,750 <br />$31,050 <br />$947,130 <br />2 <br />Lincoln Dr to Wheeler (around the south side of <br />Box Culvert with 8 foot wide bituminous trail <br />0.32 <br />$144,000 <br />$75,000 <br />$56,000 <br />$22,080 <br />$297,080 <br />Oasis Pond) <br />connecting to existing park trail <br />2 <br />Wheeler to Fairview <br />share the road <br />0.13 <br />$650 <br />$650 <br />2 <br />Fairview to Langton Lake Park <br />share the road <br />0.2 <br />$1,000 <br />$1,000 <br />2 <br />Langton Lake Park to Cleveland <br />share the road <br />0.45 <br />$2,250 <br />$2,250 <br />2 <br />Centre Pointe Drive to Long Lake Road <br />Pedestrian Bridge with 8 ft wide pathway <br />0.13 <br />$58,500 <br />$1,600,000 <br />$22,750 <br />$8,9701 <br />$1,690,220 <br />2 <br />Long Lake Road to Long Lake Road <br />stripe shoulders on road <br />0.25 <br />$1,250 <br />$1,050 <br />$2,300 <br />2 <br />Long Lake Road to Highway 88 <br />stripe shoulders on road <br />0.5 <br />$2,500 <br />$2,100 <br />$4,600 <br />21 <br />Highway 88 to Hi hcrest <br />stripe shoulders on road <br />0.2 <br />$1,000 <br />$840 <br />$1,840 <br />2 <br />3 <br />County Road C2 (E of Snelling) <br />86 <br />On and off road pathways from the Snelling <br />$450,000 <br />$175,000 <br />$69,000 <br />$694,000 <br />Future <br />2,350 <br />Avenue to Victoria Street <br />3 <br />Off Road <br />3 <br />Snelling to Hamline <br />6 ft wide sidewalk on one side of the road <br />0.5 <br />$225,000 <br />$87,500 <br />$34,500 <br />$347,000 <br />3 <br />Lexington to Victoria <br />6 ft wide sidewalk on one side of the road <br />0.5 <br />$225,000 <br />$87,500 <br />$34,500 <br />$347,000 <br />4 <br />County Road C- On Road <br />128 <br />On -road bicycle facility from Lexington Avenue to <br />2 <br />Future <br />8,250 <br />Rice Street <br />4 <br />Restripe <br />work with Ramsey County on restriping the road to a <br />2 <br />$5,000 <br />$9,700 <br />$14,700 <br />3 lane configureation <br />5 <br />County Road C Sidewalk <br />117.5 <br />Sidewalk on the north side of County Road C <br />0.5 <br />$225,000 <br />$87,500 <br />$23,000 <br />$335,500 <br />Future <br />7,400 <br />from Western to Rice Street <br />5 <br />Acorn Park Pedestrian Crossing <br />Construct a pedestrian refuge in center of street OR <br />$15,000 <br />$15,000 <br />Future <br />construct curb bump outs to increase safety <br />Off -road trail connection from Highway 280 to <br />7 <br />County Road B <br />130 <br />Rice Street- only missing segment is TH 280 to <br />1 <br />$370,000 <br />$175,000 <br />$34,500 <br />$579,500 <br />2015 -2020 <br />1,300 <br />Cleveland <br />7 <br />Widen street for an on -road facility <br />1 <br />$160,000 <br />$2,500 <br />$2,100 <br />$175,000 <br />$339,600 <br />8 <br />Roselawn Ave <br />110 <br />On road and off -road pathways from west City <br />2.25 <br />$360,000 <br />$1,012,500 <br />$4,725 <br />$393,750 <br />$1,770,975 <br />Future <br />2,900 <br />boundary to Hamline Avenue <br />8 <br />Off Road <br />There is already a off road facility in Falcon Heights <br />13,700 <br />in this corridor <br />8 <br />Cty Boundary to Cleveland <br />6 ft wide concrete sidewalk- one side <br />0.75 <br />$337,500 <br />$131,250 <br />$25,875 <br />$494,625 <br />1 of 4 8/22/2013 <br />