Laserfiche WebLink
Pathway Master Buildout Plan <br />Estimated Cost <br />Length <br />Funding <br />Traffic <br />Score <br />Description <br />(Miles) <br />Build Year <br />Source <br />Counts <br />Retaining <br />(Scoring per 2008 Pathway Master Plan) <br />On Road <br />Signage <br />Off Road <br />Bridge <br />Striping <br />Drainage <br />wall <br />Total <br />81 <br />Cleveland to Fairview <br />6 ft wide concrete sidewalk- one side <br />0.5 <br />$225,000 <br />$87,500 <br />$17,250 <br />$329,750 <br />8 <br />Fairview to Snelling <br />6 ft wide concrete sidewalk- one side <br />0.5 <br />$225,000 <br />$87,500 <br />$17,250 <br />$329,750 <br />8 <br />Snelling to Hamline <br />6 ft wide concrete sidewalk- one side <br />0.5 <br />$225,000 <br />$87,500 <br />$17,250 <br />$329,750 <br />8 <br />On Road <br />Difficult to construct without a full road project and <br />Falcon Heights cooperation <br />8 <br />Cty Boundary to Cleveland <br />0.75 <br />$120,000 <br />$1,575 <br />$121,575 <br />8 <br />Cleveland to Fairview <br />0.5 <br />$80,000 <br />$1,050 <br />$81,050 <br />8 <br />Fairview to Snelling <br />0.5 <br />$80,000 <br />$1,050 <br />$81,050 <br />8 <br />Snelling to Hamline <br />0.5 <br />$80,000 <br />$1,050 <br />$81,050 <br />9 <br />Larpenteur Ave <br />925 <br />An off -road trail from Reservoir Woods to Galtier <br />0.5 <br />$225,000 <br />$87,500 <br />$13,800 <br />$326,300 <br />Future <br />12,800 <br />Street- 6 ft concrete sidewalk <br />On and off road, between County Road C and <br />County Road D. On road is not recommended <br />10 <br />Cleveland Ave <br />9275 <br />until road is reconstructed. Segment has a <br />0.85 <br />$382,500 <br />$148,750 <br />$23,460 <br />$554,710 <br />Future <br />6,700 <br />pathway on the west side from just north of the <br />35W ramps all the way to County Road D (around <br />Centre Pointe <br />Wal Mart is constructing a sidewalk on the east side <br />10 <br />Off road <br />from County Road C to Twin Lakes Parkway so the <br />segment is not included <br />10 <br />Twin Lakes Parkway to County Road C2 <br />6 ft wide sidewalk <br />0.4 <br />$180,000 <br />$70,000 <br />$11,040 <br />$261,040 <br />10 <br />County Road C2 to County Road D <br />6 ft wide sidewalk- already at Applewood <br />0.45 <br />$202,500 <br />$78,750 <br />$12,420 <br />$293,670 <br />11 <br />Fairview Ave (North of C) <br />118.5 <br />On -road and off -road pathways between County <br />1 <br />Future <br />8,100 <br />Road B2 and County Road D <br />11 <br />On Road <br />On road exists with shoulders today- cost is for <br />1 <br />$2,500 <br />$2,100 <br />$4,600 <br />aint and si ns <br />11 <br />Off Road <br />$200,000 <br />$87,500 <br />$28,750 <br />$316,250 <br />13,700 <br />11 <br />County Road C2 to County Road D <br />8 ft wide Bituminous Pathway- one side <br />0.5 <br />$200,000 <br />$87,500 <br />$28,750 <br />$316,250 <br />Work with Arden Hills to develop a regional <br />pathway connection along Snelling Avenue to Old <br />Snelling Avenue in Arden Hills connecting <br />13 <br />TH 51 pathway connection to Old Snelling <br />104 <br />Roseville to MoundsView High School, Valentine <br />0.5 <br />$200,000 <br />$87,500 <br />$17,250 <br />$304,750 <br />Future <br />31,000 <br />(Arden Hills) <br />Hills Elementary School, Bethel College, Lake <br />Johanna Park and County Road E2 commercial <br />businesses <br />An off -road pathway from County Road B -2 to TH <br />14 <br />Hamline Ave <br />102.3 <br />51 (Snelling)- sidewalk exists on west side from <br />1.75 <br />$718,500 <br />$306,250 <br />$60,375 <br />$1,085,125 <br />Future <br />6,817 <br />County Road B -2 to County Road C <br />14 <br />Off Road <br />14 <br />County Road C2 to City Bdry <br />8 ft wide Bituminous Trail- one side <br />0.75 <br />$300,000 <br />$131,250 <br />$25,875 <br />$457,125 <br />14 <br />County Road C to County Road C2 <br />8 ft wide Bituminous Trail- one side <br />0.5 <br />$200,000 <br />$87,500 <br />$17,250 <br />$304,750 <br />14 <br />County Road B2 to County Road C <br />tear out sidewalk and construct 8 ft wide trail <br />0.5 <br />$218,500 <br />$87,500 <br />$17,250 <br />$323,250 <br />Off -road trail on the east side of Lexington <br />15 <br />Lexington Ave <br />120.5 <br />Avenue from Larpenteur Avenue north through <br />3 <br />$1,140,000 <br />$498,750 <br />$98,325 <br />$1,737,075 <br />Future <br />15,100 <br />the City connecting to Shoreview's pathway <br />s stem <br />15 <br />Count Road C2 to Count Road D <br />8 ft wide Bituminous Pathway- east side <br />0.5 <br />$200,000 <br />$87,500 <br />$17,250 <br />$304,750 <br />15 <br />Count Road C to Count Road C2 <br />8 ft wide Bituminous Pathway- east side <br />0.5 <br />$200,000 <br />$87,500 <br />$17,250 <br />$304,750 <br />151 <br />County Road B2 to County Road C <br />8 ft wide Bituminous Pathway- east side <br />0.35 <br />$140,000 <br />1 $61,250 <br />$12,0751 <br />$213,325 <br />151 <br />County Road B to County Road B2 <br />8 ft wide Bituminous Pathway- east side <br />0.5 <br />$200,000 <br />1 <br />1 $87,500 <br />$17,2501 <br />$304,7501 <br />1 <br />2 of 4 8/22/2013 <br />