Laserfiche WebLink
ROSEVILLE PARKS RENEWAL PROGRAM - NATURAL RESOURCE PROJECTS <br />Park <br />Location within <br />Type <br />Size <br />Est. <br />Type <br />Project cost estimate <br />Funding <br />Maintenance <br />Comments <br />Rank <br />ark <br />Priority <br />AC, SF or LF <br />Habitat <br />water <br />PRRP <br />Grant <br />Other <br />quality <br />East side of <br />Woodland /Forest <br />Cut /treat invasive, nonnative shrubs. This is relative low <br />LADYSLIPPER <br />wetland, north of <br />1 AC <br />Low <br />X <br />$6,000 <br />X <br />Y <br />5 <br />Restoration <br />priority due to proximity to residential lots, poor accessibility. <br />Owasoso Blvd <br />LADYSLIPPER <br />Wetland <br />Wetland Restoration <br />-10 AC <br />Ver low <br />X <br />X <br />Y <br />Manage narrow -leaf cattail and other potential invasives. <br />5 <br />Ladyslipper Total <br />$6,000 <br />OASIS <br />Multiple locations <br />Woodland /Forest <br />3.8 AC <br />Medium <br />X <br />$22,800 <br />X <br />Y <br />Invasive cut /treat, reintroduce native woodland grasses and <br />6 <br />around park <br />Restoration <br />flowers where possible, two years of follow -up treatments. <br />NE side of park, CR <br />Medium- <br />Between proposed boardwalk /trail and lake shore. Potential <br />OASIS <br />C2 cul de sac <br />Shoreline restoration <br />225 LF <br />high <br />X <br />X <br />$29,925 <br />X <br />X <br />Y <br />CWP and /or watershed project. Approximately 225 LF of <br />6 <br />shoreline <br />Improvments to stream outlet infrastructure /riffles and <br />OASIS <br />Outlet channel, <br />Stream restoration <br />0.3 AC. 320 LF <br />Medium- <br />X <br />$15,000 <br />X <br />Y <br />vegetative restoration to improve both stability and water <br />6 <br />East side <br />est. <br />high <br />quality. Requirs hyrologic anaysis and additional analysis to <br />determine if feasible - $8,000 <br />Oasis Total <br />$67,725 <br />Woodland /Forest <br />Woodland /Forest <br />Cut /treat invasives, native seeding, Rx burn, follow -up treat <br />ACORN <br />AC -1-11, AC -1_12, AC- <br />Restoration <br />25 AC <br />High <br />X <br />$150,000 <br />X <br />Y <br />invasive brush. Approximately 24.7 acres. <br />7 <br />U3 <br />Hydrologic (ditch block), vegetation management. Could <br />ACORN <br />AC -W2 <br />Wetland Restoration <br />0.25 AC est. <br />High to <br />X <br />X <br />$15,000 <br />X <br />X <br />Y <br />qualify as a water quality project (increase storage /treatment). <br />7 <br />medium <br />Construction cost estimate requires to be combined with <br />Langton Wetland Restoration Project. <br />Manage purple loosestrife with biocontrol, invasive vegetation <br />ACORN <br />AC -W5 <br />Wetland Restoration <br />5 AC <br />Low <br />X <br />$25,000 <br />Y <br />management (RCG & glossy buckthorn) in areas mapped as <br />7 <br />wet meadow and willow swamp (MLCCS): total estimated 5 <br />acres <br />ACORN <br />AC -W1 <br />Wetland Restoration <br />4 AC est <br />Low <br />X <br />$2,500 <br />X <br />Y <br />Purple loosestrife biocontrol release <br />7 <br />ACORN <br />Between disc golf <br />Prairie Reconstruction <br />2 AC <br />Medium <br />X <br />$4,000 <br />X <br />X <br />Y <br />Treat nonnatives, burn, interseed natives <br />7 <br />fairways <br />Acorn Total <br />$196,500 <br />Cut /treat invasive nonnatives and select trees, chip /remove <br />APPLEWOOD <br />Slope of pond <br />Prairie /Savanna Restoration <br />0.75 AC <br />Medium <br />X <br />X <br />$12,000 <br />X <br />X <br />Y <br />from site, site prep herbicide x2, native seeding, 2 years of <br />8 <br />OVERLOOK <br />grow -in maintenance. Low potential, but may be funded by <br />CWL fund and /or watershed as buffer restoration. <br />APPLEWOOD <br />Woodland /Forest <br />Cut /treat invasive woody brush /trees, chip /remove, selective <br />East border <br />0.25 AC <br />Low <br />X <br />$10,000 <br />X <br />Y <br />thin to favor native hardwood trees, spray ground layer x2, <br />8 <br />PARK <br />Restoration <br />native seeding & 2 years grow -in maintenance. <br />Applewood Total <br />$22,000 <br />