Laserfiche WebLink
ROSEVILLE PARKS RENEWAL PROGRAM - NATURAL RESOURCE PROJECTS <br />Park <br />Location within <br />Type <br />Size <br />Est. <br />Type <br />Project cost estimate <br />Funding <br />Maintenance <br />Comments <br />Rank <br />ark <br />Priority <br />AC, SF or LF <br />Habitat <br />water <br />PRRP <br />Grant <br />Other <br />quality <br />AUTUMN GROVE <br />SE Park sign <br />Native landscaping <br />250SF <br />Low <br />$1,000 <br />X <br />Y <br />Convert plantings around sign to formal native landscaping <br />8 <br />Autumn Grove <br />$1,000 <br />Total <br />Cut /treat invasive brush and invasive weeds, remove SOME <br />KELLER <br />Pond Buffer <br />Pond Buffer Restoration <br />.6 AC <br />Medium <br />$6,000 <br />Y <br />coarse woody debris, seed /plant natives in woodland edge and <br />9 <br />MAYFLOWER <br />in seasonal wetland itself. This is a small area with limited <br />benefit ecologically. <br />Keller Mayflower <br />$6,000 <br />Total <br />Manage pond buffer (cut/treat invasives, restore native <br />HOWARD <br />Pond Buffer <br />Pond Buffer Restoration <br />2.8 AC <br />Medium <br />X <br />X <br />$16,800 <br />X <br />Y <br />vegetation) and management/plant wetland edge /emergent <br />10 <br />JOHNSON <br />wetland vegetation. Two years of ongoing management. <br />Estimated cost 6 000 /ac. <br />Howard Johnson <br />$16,800 <br />Total <br />Cut /treat invasives (very thick), native woodland seeding, <br />WILLOW POND <br />All woodland areas <br />Woodland /Forest <br />7 AC <br />Medium <br />X <br />$52,500 <br />X <br />Y <br />potential planting of native bare root tree stock, 2 years grow- <br />11 <br />Restoration <br />in maintenance. Est. $7,500 /ac. Not likely a good candidate for <br />grant funding due to lack of pre- existing native habitats. <br />This wetland is dominated by the nonnative reed canary grass, <br />WILLOW POND <br />Wetland in north <br />Wetland Restoration <br />0.9 AC <br />Medium- <br />X <br />$7,500 <br />X <br />Y <br />as well as the native river bulrush. Treatment of reed canary <br />11 <br />arm of park <br />low <br />grass may or may not result in significant improvement in the <br />quality of the vegetative community at this site. <br />Shoreline restoration in this area would provide a high profile <br />restoration with reasonably high opportunity for success. Cost <br />WILLOW POND <br />Northeast shoreline <br />Shoreline restoration <br />0.5 AC <br />Medium- <br />X <br />X <br />$35,000 <br />X <br />X <br />Y <br />also includes design, manufacture and install of interpretive <br />11 <br />area <br />high <br />sign ($5K). Cost includes native vegetative restoration along <br />shoreline with primarily seeding . Installation of plant plugs <br />would require additional cost. <br />Willow Pond <br />$95,000 <br />Total <br />