Laserfiche WebLink
34 City's website at www.cityofroseville.com /projects, and as detailed in the staff <br />35 report dated September 24, 2013. <br />36 <br />37 Discussion included member observation of the water pipe lining process and <br />38 problems encountered with this new technology, causing staff to recommend <br />39 deletion of the Transit Avenue segment due to continual delays in this first <br />40 portion of the project scope; Mr. Schwartz' review of the problem areas and <br />41 issues to be addressed with this type of application as it evolves, and long -term <br />42 warranty (15 years for the entire pipe) for full replacement for the work done to- <br />43 date that exceeds the typical one -year contractor warranty; and potential for the <br />44 product in the future as these trial applications are evaluated. <br />45 <br />72 Member Felice called to the PWETC's attention a missing piece of the pathway <br />73 plan previously identified: Fairview Avenue from County Road B -2 to County <br />74 Road C, with a bus stop in the middle of that segment on the west side of <br />75 Fairview Avenue, currently without a sidewalk to it and no appropriate crosswalk. <br />76 Member Felice noted that this area provided access to a number of businesses, but <br />77 was currently very difficult to cross. Member Felice asked that this segment be <br />78 included in the ranking as a high priority, as she had observed that the Fairview <br />79 trail was used quite heavily. <br />Page 2 of 19 <br />