Laserfiche WebLink
Attachment B <br />Project 12 -21 <br />PIK Demolition <br />Project Financing Summary <br />Final Cost <br />1 Site demolition- Urban Contracting <br />$ <br />397571.00 <br />2 Total Construction Cost <br />5s <br />39,571.00 <br />3 <br />4 Roseville Engineering <br />$ <br />117153.25 <br />5 Urban Contracting Permit <br />$ <br />663.00 <br />6 Environmental Assessment <br />$ <br />47625.93 <br />7 Total Engineering Costs <br />$- <br />16,442.18 <br />8 <br />9 <br />10 Total Project Costli $ 56,013.18 <br />11 <br />12 <br />13 Summary of Assessment Calculations <br />14 Assessable Cost <br />$ <br />56,013.18 <br />15 <br />16 Total Special Assessments lis 56,013.18 <br />17 <br />18 Project Financing Summary <br />19 Special Assessments lis 56,013.18 <br />