My WebLink
|
Help
|
About
|
Sign Out
Home
2013-11-07_PR_Comm Minutes
Roseville
>
Commissions, Watershed District and HRA
>
Parks & Recreation
>
Parks & Recreation Commission
>
Minutes
>
2013
>
2013-11-07_PR_Comm Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2014 2:07:19 PM
Creation date
1/15/2014 2:07:17 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Over time, the initial Natural Resource and Trails Work Group <br /> indicated that they were most interested in actually doing work on <br />Natural Resource projects and less interested in meetings. Because of <br /> this, NRATS (Natural Resources and Trails Subcommittee) was <br />formed with representatives of the Public Works Commission and <br />Parks and Recreation Commission who agreed to work together to <br />coordinate the Parks and Recreation Master Plan as it relates to <br />pathways and connections and the Pathway Master Plan as well as <br />review projects. <br /> <br /> <br />Grefenberg is also concerned by recent talks of land acquisitions in SW Roseville and <br />feels the pace of acquiring a location for future parks may be out pacing current <br />neighborhood engagement. <br /> <br />Grefenberg said they want to be a part of the discussions regarding spending <br />o <br />funds in SW Roseville and would like to meet <br /> as a group before a final commitment is made for land acquisition. <br /> <br />Brokke spoke of the Master Plan guidance for development in SW Roseville. <br />o <br />Three strategies are identified; small parcels, large parcels and connectivity. <br />As parcels become available we will consider their fit within the Master Plan <br />guidelines. <br /> <br />Staff recognizes there is more work to be done and community <br />meetings will be scheduled, the plan is to get SW Roseville back <br />together after the 1of the year. <br />st <br /> <br />3. APPROVAL OF MINUTES – OCTOBER 1, 2013 MEETING <br /> Commission Recommendation: <br /> Minutes for the October 1, 2013 meeting were approved unanimously. <br /> <br /> Following the approval of the October minutes, Matt Johnson, the recently hired Recreation <br /> Supervisor introduced himself and talked a little about his background. <br /> <br /> 4. PARK & RECREATION RENEWAL PROGRAM <br />Brokke introduced design and consulting team members present to discuss most recent work <br />on the Renewal Program. Michael Schroeder with LHB was in attendance to talk about park <br />shelter designs, Tim McILwain from HCM Architects was present to discuss the park <br />building designs and Tim Wold from SRF was at the meeting to provide information on <br />courts, fields and site work. <br />Brokke shared that the Renewal Program is moving relatively quickly at this point, it is <br />important that we get final plans and specs completed in an effort to get proposals out early <br />in 2014. Designs for the buildings and shelters are more than 50% complete; the design team <br />will review all structures with the Commission tonight. The plan is to bring a set of plans to <br />the Council on November 25 and to have plans completed in early December. <br /> <br />Schroeder talked to the Commission about how the team is working to develop the enclosed <br />buildings and open shelters. Schroeder walked through the shelter plans for Victoria <br />Ballfields, FORParks and the Foundation Shelters. Design includes using the existing truss <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.