My WebLink
|
Help
|
About
|
Sign Out
Home
2014_0210_CCpacket
Roseville
>
City Council
>
City Council Meeting Packets
>
2014
>
2014_0210_CCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2014 11:05:39 AM
Creation date
2/6/2014 3:09:09 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sidewalks. Preliminary cost estimates have been developed, and are listed below. Additional <br />costs may be incurred in order to address existing storm water issues and also to accommodate <br />the additional runoff from the new impervious surfaces proposed under this project. Any storm <br />water costs would be paid for from the Starm Water utility fund. <br />The majority of wark proposed under this project would be conducted by City staf£ A paving <br />contractor would be hired to pave the shoulder. Any required soil or landscaping materials for <br />the storm water features would constitute the greatest cost of those items outside of the City staff <br />time. <br />Item Estimated Construction Cost <br />Ex anded Shoulder'� $130,000 <br />O tional Sidewalk between Fairwa s and Fulham $25,000 <br />Storm water costs $5,000 <br />En ineerin for storm water treatment $3,000 <br />Total Construction Cost without sidewalk: $138,000 <br />Total Construction Cost with sidewalk: $168,000 <br />Estimated Outside materiaUcontractar costs shoulder $100,000 <br />only (portion of above costs)�* <br />'�Includes city staff and equipment costs <br />�*Estimated outside materiaUcontractor costs are total costs that would be incurred outside of <br />City of Roseville staff time and equipment costs. <br />STAFF RECOMMENDATION <br />Receive additional public comment on the proposed County Road B interim pedestrian interim <br />project, and authorize staff to prepare final plans and construct the facility in 2014. <br />Authorize use of Park and Recreation Renewal Program funds for outside material and <br />contractor costs, estimated at $100,000. <br />REQUESTED COUNCIL ACTION <br />Receive public comment on the proposed County Road B-2 and Victoria sidewalk project, and <br />authorize staff to prepare final plans and specifications and advertise for bids. <br />Prepared by: Marc Culver, City Engineer <br />Attachments: A: Project Layout <br />B: Comment Card from January 16t'' Neighborhood Meeting <br />C: Resident email with project comment <br />D: Figure depicting optional sidewalk between Fairways Lane and Fulham Street <br />E: Counry Road B Pathway Meeting Suggested Features Resident Input <br />F: Staff response to Item E. <br />Page 3 of 3 <br />