Laserfiche WebLink
<br />PLANNING APPLICATION NARRATIVE REQUIREMENTS <br /> <br />1. 1150' X 1350' <br /> <br />2. Nature of Buildings. <br /> <br />The existing and proposed buildings are shown on the building <br />layout drawing. The existing manifold building is used to house <br />motor operated valves, piping and metering equipment. It is <br />36' x 50', pre-engineered metal building. <br /> <br />The two existing control buildings are used for electrical control <br />equipment that operates the motor operated valves and pumping <br />station. Both are metal frame buildings. <br /> <br />The existing diesel building is used to house a diesel engine and <br />pump. It is also a metal frame building. This building will be <br />removed as part of our new station revisions. <br /> <br />3. Proposed use of land and buildings. <br /> <br />The proposed pump building is needed to house the new electric <br />motor and pump along with the motor operated valves and <br />instrumentation. This new installation will replace the existing <br />diesel unit. <br /> <br />The proposed control building will be used for the electrical <br />control equipment needed to operate the new motor and valves. <br /> <br />5. This is a pipeline transportation system, delivering refined <br />petroleum products to our distribution centers since 1947, with <br />approximately 25 employees in the Minneapolis area. <br /> <br />7. We do not feel it is necessary to construct a brick face on the <br />proposed buildings. As shown on the site plan, the buildings are <br />shielded from public view in all directions so only Amoco employees <br />will see the buildings. The metal buildings we intend to build are <br />high quality structures, in appearance and strength. <br /> <br />8. The current drainage situation will not be altered. <br /> <br />10. Trash is picked up regularly by our maintenance personnel and <br />disposed of through our facilities at Brooklyn Park. Therefore, no <br />trash enclosures are necessary. <br />