Laserfiche WebLink
�� � Staff recommends that Urban Companies LLC be selected as the contractor to perform field <br />�,� improvements at Central Park Dale West (Legion Baseball Field), Central Park Victoria East Softball <br />�; Field Complex and Evergreen Park as outlined in the attached pre-award document. <br />1 �' <br />��� This package is recommended to be funded in the Renewal Program budget as planned. <br />1i <br />�, Package H- Irrigation Replacement and Upgrades <br />�� There were 5 proposals received on Package H. With the procurement process complete, the Best Value <br />� a Contractor for the irrigation replacement and upgrades package has been identified as Anderson Irrigation <br />�� Inc. to upgrade existing irrigation systems to a two wire and control systems. The initial budget was <br />� f� $302,000. Their initial proposal was $293,324. Through value engineering and clarification of the project, <br />�€ the total cost for this package is $227,437.68 <br />1£3� <br />�� Staff recommends that Anderson Irrigation Inc. be selected as the Best Value contractor to perform <br />�� irrigation improvements to Acorn Park, Autumn Grove Park, Central Park Dale Street West, Central Park <br />�� Lexington, Central Park Victoria East, Evergreen Park, Langton Lake Park, Lexington Park and <br />��� Rosebrook Park as outlined in the attached pre-award document. <br />1 s; <br />���� This package is recommended to be funded by the Renewal Program budget as planned. <br />� c; <br />�� Package I— Natural Resources <br />��� There were 3 proposals on Package I. With the procurement process complete, the Best Value Contractor <br />�s has been identified as Stantec Consulting Services Inc. The initial budget was anticipated at $1,500,000. <br />�� This package is to perform site analysis as necessary, remove and dispose of invasive plants, restore <br />��� portions of existing park, maintenance/management of restored areas for a three year period, develop, <br />� �, fabricate and install an educational signage program and orchestrate volunteer efforts directed to natural <br />� �, resources and restoration proj ects. The initial proposal was for $1,131,700. Through proj ect clarification, <br />� s the total cost for this package is $1,500,000 including the Value Add option of $368,300 to pursue a <br />2c� matching grant program to complete all projects identified in the type, size and location chart. <br />2 c; <br />2��� Stantec Consulting Services Inc. provided a Value Added option of pursuing high likelihood grant <br />20� opportunities as a part of their contract. The remaining budgeted amount of $368,300 would be held by <br />2c the City to pursue those grant opportunities. Staff is recommending to accept this Value Add item for <br />2�� $368,300 to be utilized as a matching grant program, provided grants are secured. <br />2c <br />2c The total cost of this package is for $1,500,000 including the Value Add option. This amount will only be <br />2r.� expended if grants are secured. <br />2c <br />2�� � Staff recommends that Stantec Consulting Services Inc. be selected as the contractor. The scope of wark <br />2• includes park system wide interpretive signage and natural resource restoration wark in 22 of the 30 <br />r Roseville Parks as outlined in the attached pre- award document. <br />2� This package is recommended to be funded in the Renewal Program budget as planned. <br />2" <br />r Package J- Disc Golf Course Improvements <br />2� There was 1 proposal received on Package J. With the procurement process complete, the Best Value <br />Contractor for the disc golf course improvements package has been identified as Kevin Casey LLC to <br />Page 5 of 8 <br />