Laserfiche WebLink
before winter shuts down site construction. <br />See Owner ldentified Risk #4: During the clarification phase we will work <br />with the City to establish acceptable construction timeframes in which each <br />Solution / Strategy: <br />project site can be under construction. It will be critical that the start and <br />finish dates established for each site are adhered to by all parties involved. <br />If established dates change during construction this deviation will be added <br />to the weeklv risk report. <br />The three foundation buildings that are throughout central park require <br />salvaging, removing, and then reinstalling the canopy structures on new <br />Identified Risk 27: foundations. The risk is that new foundations will no match the existing <br />canopy bolt settings and the canopy structure will not fit on the new <br />foundations. <br />Solution / Strategy: � This work is no longer part of the project scope. <br />The scope of the work for the installation of the splash pad equipment and <br />concrete pad is not clearly addressed in the addendum. The intent is clear <br />Identified Risk 28: that the owner is supplying the equipment, but it is not clear as to who is <br />responsible for the installation of the splash pad equipment, piping, and <br />concrete portion of the work. <br />Solution / Strategy: � See Project Assumptions. <br />Each construction site is located in a public area that will have minimal <br />Identified Risk 29: lighting during construction until new utilities are installed and functional. <br />This is a security risk as sites such as this are easy targets for vandalism. <br />See Owner ldentified Risk #3: We conduct pre-construction meetings with <br />our subs and vendors in which we discuss safety with regards to the job site <br />Solution / Strategy <br />and public safety. We have a site specific safety plan that will be <br />distributed to all our subs and vendors. Jobsite perimeters will be clearly <br />defined/separated from the public. Tools and materials will be secured or <br />removed from every site on a daily basis. <br />SECTION 5 — SCOPE OVERVIEW <br />A clear description of "what's in" and "what's out" of the scope. <br />Scope of Work <br />INCLUSIONS: <br />This agreement is based upon and includes the following documents: <br />1. Project Manual prepared by LHB, Inc. dated January 21, 2014 Volume I <br />2. Project Manual prepared by LHB, Inc. dated January 21, 2014 Volume II <br />3. The following drawings prepared by LHB, Inc. dated January 21, 2014 <br />4. Note: struck out drawings represent sites that have been eliminated by Client Requested Scope <br />Changes <br />Sheet Description <br />^�� r,,..,,.-cH,,,,+n.--..., ..i�,�,,., <br />1� <br />Location <br />�� <br />