My WebLink
|
Help
|
About
|
Sign Out
Home
2014_0512_CCpacket
Roseville
>
City Council
>
City Council Meeting Packets
>
2014
>
2014_0512_CCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2014 1:45:24 PM
Creation date
5/8/2014 2:29:59 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 4— RISK MANAGEMENT PLAN <br />A complete list of all pre-identified risks that the Vendor does not control. <br />Identified Risk 1: <br />Solution / Strategy <br />Identified Risk 2: <br />Potential damage of interior owner items currently in place. This includes <br />furniture, animal mounts, aquariums etc. <br />During our site review with staff, we identified pieces that were to be <br />removed and also storage spaces within the facility to limit the moving, and <br />avoid the potential for any damage. The owner will be responsible for <br />moving all of the display items. We have budgeted 2 weeks in our schedule <br />for this activity and show a completion date for moving of 11.16.14. <br />Potential tree and bituminous trail damage as the building is 150 feet <br />from the nearest parking area. <br />We met on-site with the staff of the facility and discussed documenting the <br />bituminous trail to ensure current conditions are understood. We do not <br />believe we will damage the trail based on discussions regarding current <br />Solution / Strategy: usage, but in the event damage occurs, B � D and the owner will have an <br />accurate record of pre-existing condition. Any damage created by our <br />construction activities will be correct at no cost to the owner. <br />Identified Risk 3: Potential injury to Visitors by entering the construction area <br />Solution / Strategy: <br />We will utilize best practices and signage to clearly identify the on-going <br />construction both during the exterior work and also the interior work. <br />Identified Risk 4: � Potential staging/parking issue with Boardwalk Contractor for Package D <br />We understand the schedule for the boardwalk project and do not believe <br />this to be a risk. The Package D contractor will likely access their work area <br />Solution / Strategy: <br />by using the gravel path and our access will be primarily at the bituminous <br />path. In Addition, the Package D contractor anticipates starting in August <br />and being completed by the end of September, which will not overlap with <br />our schedule. <br />Identified Risk 5 <br />Solution / Strategy: <br />Interruption of Programming At Facility During Our Constriction Activities <br />We met with the facility staff and better understand the reoccurring <br />activities hosted at the building that were not previously communicated. At <br />this meeting, the staff indicated we would be issued a schedule of events <br />from the owner. Once we receive this information, we will accommodate <br />the reoccurring activities by focusing our efforts away from spaces where <br />visitors may be, and in advance of visitors we will clean and make area safe. <br />Based on the information provided by the staff, the events were small, <br />could be rescheduled as needed, and infrequent, which leads us to believe <br />the change in occupancy plans during construction does not pose a risk to <br />our schedule, costs, or customer satisfaction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.