Laserfiche WebLink
SECTION 5 — SCOPE OVERVIEW <br />Janke General Contractors, Inc., is pleased to have the opportunity to provide our costs to the Ciry of Roseville for the <br />2012-2016 Parks and Recreation Renewal Program. Proposal Package D: Bridges and Harriet Alexander Nature Center <br />(HANC) Boardwalk <br />Janke General Contractors offers many years' eaperience in fabricarion as well as the installarion of boardwalks and <br />bridges. With that said, we are very confident that our numbers are competitive. We have made no assumptions. Our <br />unique method is steel framing with wood joists, along with being able to fabricate the steel components in-house. <br />Below is a breakdown of our cost. <br />Total <br />• Mobilization <br />• Engineering <br />• Soil Boring <br />• Survey <br />• Boardwalk Materials <br />• Boardwalk Shop Fabrication <br />• Boardwalk Installation in Field <br />• Boardwalk Base Bid Painted Steel <br />• Pedestrian Bridges Material <br />• Pedestrian Bridges Installation <br />Overhead and Profit <br />Option Galvanized Steel <br />Option Screw Jack System <br />$30,300.00 <br />$ 4,000.00 <br />$10,000.00 <br />$ 6,000.00 <br />$93,473.00 <br />$24,382.00 <br />$75,415.00 <br />$12,934.00 <br />$57,420.00 <br />$77,580.00 <br />$80,733.50 <br />$472,237.50 <br />Included in our price <br />• Painted Steel Framing <br />• Wood Joists <br />• Wood Deck <br />• Teaching Platform per plan <br />• Concrete pavilion per plan <br />• Engineering <br />• 3 bridges on shallow footing up to 15 foot <br />• Pedestrian Loading <br />• Adjustable legs boardwalk +/- 6 inches <br />• Tree and Brush Removal <br />• Erosion Control <br />• Soil Borings <br />• All Hardware <br />$34,700.00 <br />$ 6,530.0 <br />Excluded in our Price <br />• Boardwalk Above 30 inches high at the top of boardwalk <br />• Boardwalk Anchors <br />• Galvanizing but have provided an optional price <br />• Railing on boardwalk except as shown on plan <br />• Vehicle loading <br />,".� <br />