Laserfiche WebLink
SECTION 4— RISK MANAGEMENT PLAN <br />A complete list of all pre-identified risks that the Vendor does not control. <br />Identified Risk 1: Signal to the cell cards maybe week due to a steel box. <br />Solution / Strategy: A Non Metallic Box <br />Electrical interference on the incoming power or into the two <br />Identified Risk 2: wire path caused from VFD's or High Voltage power lines to <br />close the wire path. <br />Solution / Strate Frequency filters and using twisted wire or relocate controller and/or <br />gy' two wire path. <br />Identified Risk 3: Materials cost inflation over the three year contract period. <br />Solution / Strate Purchase all the materials in the year that the contract was <br />gy' awarded. <br />