Laserfiche WebLink
SECTION 5 — SCOPE OVERVIEW <br />A clear description of "what's in" and "what's out" of the scope. <br />Eliminate Oasis Park and Villa Park. <br />C.P. Victory East is not a new install, we will be reconstructing water service, pouring a new concrete <br />pad, installing new metal enclosure, adding new Acclima 3500 moisture sensing control system, moving <br />controller to new irrigation enclosure, installing flow sensor, running a new two wire path to existing <br />control valves, moving main line around new play area and reconnecting cut off zones. Installing quick <br />couple valves behind pitcher mound. Raising heads and moving heads when they regrade park. <br />C P Lexington install new controller and two wire path to ball fields only. Add a flow sensor. C P Lexington <br />flowers providing new two wire path to flowers and turf zones and new zones to separate the turf from <br />flowers. Also adding additional moisture sensors. <br />Acorn Park is installing a Acclima controller and a moisture sensor. <br />C.P. Dale West is installing a Acclima controller and a moisture sensor. <br />Langton Lake is installing a Acclima controller and a moisture sensor. <br />Lexington Park is adding and reconnecting to existing irrigation. <br />Rosebrook Park is installing a Acclima controller and a moisture sensor. <br />Evergreen Park is installing new irrigation to four ball field. <br />Autumn Grove is installing a new irrigation system. <br />,".� <br />