Laserfiche WebLink
SECTION 6 — PROJECT ASSUMPTIONS <br />A detailed list of all proposal assumptions that may impact cost, schedule, or satisfaction. <br />C.P. Victoria East any damaged heads due to grading was the city's <br />Assumption 1: responsibly for damaged heads. <br />Solution / Strategy: If our assumption was incorrect, we will.... <br />Assumption 2: <br />Anderson Irrigation is assuming all wires that are to be reused are in good <br />condition. <br />Solution / Strategy: <br />If our assumption was incorrect, we will install new wires. The City is <br />responsible for additional costs. <br />