Laserfiche WebLink
<br />calibre Ridge Partnership, Case No. 2355 <br /> <br />Page 3 <br /> <br />Engineerina Considerations <br /> <br />Many of the same engineering comments related to the final design <br />of the utility systems apply to this amended plan, and will be <br />submitted with the final plans. A new comment is the Fire <br />Marshal's request for an additional fire hydrant along the central <br />private drive south of the southwest corner of Building No.3. <br /> <br />4. CONCLUSION AND RECOMMENDATION <br /> <br />We believe the proposed changes are an improvement to the project <br />and recommend approval of the amended plan with the following <br />conditions: <br /> <br />1) That a revised parking plan be approved by city Staff to <br />reflect the concern about the balance of parking spaces <br />for Buildings Nos. 3 and 5. <br /> <br />2) That the engineering staff approve the final design of <br />the water, sanitary sewer, and storm sewer plans, and <br />approve the required' new easement locations and <br />descriptions. <br />