Laserfiche WebLink
<br />Project Description <br />Page 3 of3 <br /> <br />DRAINAGE: <br /> <br />The entire Building F site storm drainage will be captured <br />in an underground storm sewer pipe system leading to a <br />retention pond to be located at the northeast corner of the <br />site. Drainage will exit .the retention pond through a <br />controlled outlet structure into an existing storm sewer <br />line along the south side of County Road C, through which it <br />will flow eastward to area drainage facilities on the east <br />side of I-35W. Design details and drainage engineering <br />calculations have been submi tted to the City Engineer for <br />review. . <br /> <br />Similarily, on the Building G site, all surface drainage <br />shall be captured by an underground storm sewer pipe system. <br />The western half of the Building G site will drain to a <br />retention pond in the northwest corner of the site, from <br />which it will exit the site via a controlled outlet <br />structure into the existing storm sewer line along County <br />Road C. The eastern half of the site will drain to the <br />northeast corner of the site and enter into an existing 16" <br />storm cul vert and the existing County Road C storm sewer <br />line, thence proceeding to the area drainage facilities east <br />of I-35W. <br /> <br />HANDLING OF TRASH: <br /> <br />All tenants will be required by the developer/landlord to <br />handle trash inside the buildings. <br /> <br />SCREENING OF ROOFTOP MECHANICAL UNITS: <br /> <br />Rooftop mechanical (HVAC) units shall be screened from <br />public view by a structural building parapet, in conjunction <br />with the placement of said mechanical units at roof <br />locations designed to screen them from public view. (See <br />plan sheet 7, "Line-of-site Sections"). Electrical <br />transformers located adjacent to the buildings are to be <br />screened with landscaping. (See Landscape Plans). <br />