Laserfiche WebLink
B. *Do you use a website as a tool to distribute stormwater educational materials? ® Yes ❑ No <br />What is the URL: w^vw.cityofroseville.com <br />C. If you answered yes in question B. above, do you track hits to the site? X❑ Yes ❑ No <br />How many hits were to the stormwater page ?: 1,755 <br />D. *Did you hold stormwater related events, presentations to schools or other such activities? ® Yes ❑ No <br />If yes, describe: <br />Roseville U is a citizen group learning how the city is run. We also host local grades schools that tour the facility throughout the course <br />of a year. <br />E. *Have specif ic messages been developed and distributed during this reporting year for Minimum Control Measure (MCM): <br />MCM 1: <br />® Yes <br />❑ No <br />MCM 4: <br />® Yes <br />[]No <br />MCM 2: <br />® Yes <br />❑ No <br />MCM 5: <br />❑X Yes <br />[]No <br />MCM 3: <br />® Yes <br />❑ No <br />MCM 6: <br />❑X Yes <br />[]No <br />F. *Have you developed partnerships with other MS4s, watershed districts, local or state ❑ Yes ® No <br />governments, educational institutions, etc., to assist you in fulfilling the requirements for MCM 1? <br />G. List those entities with which you have partnered to meet the requirements of this MCM and <br />describe the nature of the agreement(s). Attach a separate sheet if necessary: <br />H. *Have you developed methods to assess the effectiveness of your public education /outreach <br />program? <br />If yes, describe: <br />❑ Yes ® No <br />Minimum Control Measure 2: Public Participation /Involvement [V.G.2] ( *Required fields) <br />A. The permit requires you to hold at least one public meeting per year addressing the Stormwater <br />Pollution Prevention Program. You must hold the public meeting prior to submittal to the <br />Commissioner of the annual report. [Part V.G.1.e.] <br />B. *Did you hold a public meeting to present accomplishments and to discuss your Stormwater ® Yes ❑ No <br />Pollution Prevention Program ( SWPPP)? <br />If no, explain: <br />C. *What was the date of the public meeting: <br />05/28/2013 <br />D. *How many citizens attended specifically for stormwater (excluding board /council members and <br />staff /hired consultants)? <br />C <br />E. *Was the public meeting a stand -alone meeting for stormwater or was it combined with some ❑ Stand -alone <br />other function (City Council meeting, other public event, etc.)? ❑X Combined <br />F. *Each permittee must solicit and consider input from the public prior to submittal of the annual ❑ Yes ® No <br />report. Did you receive written and /or oral input on your SWPPP? [Part V.G.2.b.1 -3] <br />G. *Have you revised your SWPPP in response to written or oral comments received from the []Yes ® No <br />public since the last annual reporting cycle? [Part V.G.2.c] <br />If yes, describe. Attach a separate sheet if necessary: <br />winw. pca. state. mn. us 651- 296 -6300 800 - 657 -3864 TTY 651- 282 -5332 or 800 - 657 -3864 • Available in alternative formats <br />wq- strm4 -06 • 12119113 Page 2 of 5 <br />