My WebLink
|
Help
|
About
|
Sign Out
Home
2014-05-27_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2014
>
2014-05-27_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2014 4:26:39 PM
Creation date
5/22/2014 4:09:41 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
5/27/2014
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Minimum Control Measure 3: Illicit Discharge Detection and Elimination [V.G.3] ( *Required fields) <br />The permit requires permittees to develop, implement, and enforce a program to detect and eliminate illicit discharges as defined <br />in 40 CFR 122.26(b)(2). You must also select and implement a program of appropriate BMPs and measurable goals for this <br />minimum control measure. <br />A. *Did you update your storm sewer system map? <br />If yes, please explain which components (ponds, pipes, outfalls, waterbodies, etc.) were <br />updated /added: <br />Note: The storm sewer system map was to be completed by June 30, 2008. [Part V. G.3.a] <br />B. *Have you modified the format in which the map is available? <br />C. If yes, indicate the newformat: ❑ Hardcopy only ❑ GIS system ❑ CAD <br />❑ Other system: <br />D. *Did you inspect for illicit discharges during the reporting year? <br />E. If you answered yes in question D. above, did you identify any illicit discharges? <br />F. If you answered yes in question E. above, how many illicit discharges were detected during the <br />reporting period? <br />G. If you answered yes in question E. above, did the illicit discharge result in an enforcement action? <br />If yes, what type of enforcement action(s) was taken (check all that apply): <br />❑ Verbal warning ❑ Notice of violation ❑ Fines ❑ Criminal action ❑ Civil penalties <br />❑ Other (describe): <br />[]Yes ® No <br />❑ Yes ® No <br />® Yes ❑ No <br />[]Yes Q No <br />❑ Yes 9 No <br />Minimum Control Measure 4: Construction Site Stormwater Runoff [V.G.4] ( *Required fields) <br />The permit requires that each permittee develop, implement, and enforce a program to reduce pollutants in any stormvwater runoff <br />to your small MS4 from construction activities within your jurisdiction that result in a land disturbance of equal to or greater than <br />one acre, including the disturbance of less than one acre of total land area that is part of a larger common plan of development or <br />sale if the larger common plan will ultimately disturb one or more acres. [Part V.G.4] <br />A. The permit requires an erosion and sediment control ordinance or regulatory mechanism that must include sanctions to <br />ensure compliance and contains enforcement mechanisms [Part V.G.4.a]. Indicate which of the following enforcement <br />mechanisms are contained in your ordinance or regulatory mechanism and the number of actions taken for each <br />mechanism used during the reporting period (enter "0" if the method was not used or "NA" if the data does not exist). <br />Check all that apply. <br />Enforcement mechanism <br />Number of actions <br />X Verbal warnings <br /># <br />NA <br />® Notice of violation <br /># <br />NA <br />® Administrative orders <br /># <br />0 <br />❑X Stop-work orders <br /># <br />0 <br />❑X Fines <br /># <br />0 <br />X Forfeit of security of bond money <br /># <br />NA <br />❑X Withholding of certificate of occupancy <br /># <br />NA <br />❑X Criminal actions <br /># <br />0 <br />❑X Civil penalties <br /># <br />0 <br />❑ Other: <br /># <br />B. *Have you developed written procedures for site inspections? <br />C. *Have you developed written procedures for site enforcement? <br />w ww. pca. state. mn. us <br />wq- strm4 -06 • 12119113 <br />g Yes ❑ No <br />® Yes ❑ No <br />651- 296 -6300 800 - 657 -3864 TTY 651- 282 -5332 or 800 - 657 -3864 • Available in alternative formats <br />Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.