Laserfiche WebLink
D. *Identify the number of active construction sites greater than an acre in your jurisdiction during <br />the 2013 calendar year: <br />E. *On average, how frequently are construction sites inspected (e.g., weekly, monthly, etc.)? weekly <br />F. *How many inspectors, at any time, did you have available to verify erosion and sediment control <br />compliance at construction sites during the reporting period? <br />Minimum Control Measure 5: Post - construction Stormwater Management in New Development <br />and Redevelopment [V.G.5] ( *Required fields) <br />The permit requires each permittee to develop, implement, and enforce a program to address stormwater runoff from new <br />development and redevelopment projects within your jurisdiction that disturb an area greater than or equal to one acre, including <br />projects less than one acre that are part of a larger common plan of development or sale that discharge into your small MS4. Your <br />program must ensure that controls are in place that would prevent or reduce water quality impacts. You must also select and <br />implement a program of appropriate BMPs and measurable goals for this minimum control measure. <br />Note: The MS4 permit requirements associated with this minimum control measure were required to be fully developed and <br />implemented by June 30, 2008. <br />A. *Have you established design standards for stormwater treatment BMPs installed as a result of Yes ❑ No <br />post - construction requirements? <br />B. *Have you developed procedures for site plan review which incorporate consideration of water X❑ Yes ❑ No <br />quality impacts? <br />C. *How many projects have you reviewed during the reporting period to ensure adequate long- <br />term operation and maintenance of permanent stormwater treatment BMPs installed as a result <br />of post - construction requirements? [Part V.G.5.b.and Part V.G.5.c]. 12 <br />D. *Do plan reviewers use a checklist when reviewing plans? ® Yes []No <br />E. *How are you funding the long -term operation and maintenance of your stormwater <br />management system? (Check all that apply) <br />[]Grants ❑X Stormwater utility fee ❑ Taxes <br />❑ Other: <br />Minimum Control Measure 6: Pollution Prevention /Good Housekeeping for Municipal <br />Operations [V.G.6] ( *Required fields) <br />The permit requires each permittee to develop and implement an operation and maintenance program that includes a training <br />component and has the ultimate goal of preventing or reducing pollutant runoff from municipal operations. Your program must <br />include employee training to prevent and reduce stormwater pollution from activities, such as park and open space maintenance, <br />fleet and building maintenance, new construction and land disturbances, and stormwater system maintenance. <br />A. *The permit requires each permittee to inspect annually all structural pollution control devices, <br />such as trap manholes, grit chambers, sumps, floatable skimmers and traps, separators, and <br />other small settling or filtering devices [Part V.G.6.b.2)] <br />B. *Did you inspect all structural pollution control devices during the reporting period? <br />C. *Have you developed an alternate inspection frequency for any structural pollution control <br />devices? [V.G.6.b.7)] <br />*Indicate the total number of structural pollution control devices for which you have developed <br />and alternative inspection frequency: <br />D. *Indicate the total number of structural pollution control devices (for example -grit chambers, <br />sumps, floatable skimmers, etc.) within your MS4, the total number thatwere inspected during <br />the reporting period, and calculate the percent inspected. Enter "0" if your MS4 does not contain <br />structural pollution control devices or none were inspected. Enter "NA" if the data does not <br />exist: <br />*Total number I *Number in <br />E. *Did you repair, replace, or maintain any structural pollution control devices? <br />vww. pca. state. mn. us <br />wq- strm4 -06 • 12119113 <br />® Yes ❑ No <br />❑ Yes ® No <br />® Yes ❑ No <br />651- 296 -6300 800 - 657 -3864 TTY 651- 282 -5332 or 800 - 657 -3864 • Available in alternative formats <br />Page 4 of 5 <br />