Laserfiche WebLink
34 None. <br />35 <br />36 4. Approval of March 25, 2014 Meeting Minutes <br />37 Member Gjerdingen moved, Member Felice seconded, approval of the March 25, <br />38 2014, meeting as amended. <br />39 <br />40 <br />41 <br />42 <br />43 <br />44 <br />45 <br />46 <br />47 <br />48 <br />49 <br />50 <br />51 <br />52 <br />53 <br />54 5. <br />55 <br />56 <br />57 <br />58 <br />59 <br />60 <br />Page 8, Line 322 ( Gjerdingen) <br />Correct to read: "... notin4 versus actin4.. . <br />Ayes: 2 <br />Nays: 0 <br />Abstentions: 5 (New members; <br />Motion carried. <br />Communication Items <br />61 At the request of Member Lenz, Mr. Culver provided a summary of the County <br />62 Road B -2 Sidewalk Project, as part of and funded by the Parks Renewal Program <br />63 currently underway for the addition of a 6' sidewalk along the north side of <br />64 County Road B -2 from Lexington Avenue to Rice Street. Mr. Culver noted that <br />65 the vast majority of this roadway was rural section, without curb and gutter, <br />66 creating challenges on placement of the sidewalk and incorporation and /or <br />67 improvement of existing drainage, but providing for significant additions of best <br />68 management practices (BMP's) to address that drainage. Mr. Culver advised that <br />69 over the next month, staff would be meeting with homeowners along that corridor <br />70 to address individual needs, interests or specific issues. Mr. Culver responded to <br />71 Member Lenz' request related to whether different signals would be installed at <br />72 Lexington Avenue as part of this project, noting the only plan was a potential <br />73 modification for the push button location with the pedestrian ramp, all under the <br />74 jurisdiction of Ramsey County and not part of the City's contract for the project. <br />75 <br />76 With a question of Member Wozniak, Mr. Schwartz noted that a pathway <br />77 extension on Victoria Street to Central Park from Co. Rd. B -2 was anticipated on <br />78 the east side as part of this project, with the portion south of B -2 to County Rd. B <br />79 anticipated for 2015, when reconstruction of Victoria south O County B to <br />Page 2 of 12 <br />