My WebLink
|
Help
|
About
|
Sign Out
Home
2014_0609_CCpacket
Roseville
>
City Council
>
City Council Meeting Packets
>
2014
>
2014_0609_CCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2014 1:53:18 PM
Creation date
6/5/2014 1:38:57 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment E <br />o Central Park Shelters (FORParks, Victoria Ballfields and Foundation) will be <br />remodeled rather than rebuilt. <br />o We will not be replacing the Central Park @ Lexington restrooms and redesigning <br />the park entrance at this time. <br />o We will not be installing a splash pad at this time. <br />o Sandcastle Park parking lot will not be relocated at this time. <br />• Package B— Skating Center Repairs <br />o Turns out, this was an odd package that combined painting work, rebuild of the <br />signature arch and addressing the banquet facility north entrance. No proposals <br />were received. Staff are warking to collect separate quotes for the wark Details <br />should be warked out in the coming weeks. This package is not going to the <br />Council on May 12tn <br />• Package C— Harriett Alexander Nature Center <br />o Project includes upgrades to mechanical and electrical systems as well as repairs <br />and improvements to building exterior and interior spaces. (Boardwalk is also being <br />replaced, this is part of package D). Staff and contractors are warking on the timing <br />of proj ects so as not to impact programs and events. Outside wark will be done in <br />the spring with interior work taking place fall and early winter. Staff will also be <br />warking with Blue Rhino's creative team to include the FORParks/FORHANC <br />display additions during the interior wark timeframe. <br />• Package D — Bridges & Boardwalk <br />o Includes 3 bridges in Villa Park and the Nature Center Boardwalk. <br />• Package E — Lighting <br />o Includes Rink, court and Lake Bennett Pedestrian Lighting. <br />• Package F— Court Resurfacing & Reconstruction <br />o Designated Tennis and Basketball Courts will be warked on. The recommended <br />proposal includes a value added component that leaves the milled surface in place <br />for the overlay. This process has proven to help minimize court cracking. <br />• Package G — Field Improvements <br />o Includes wark at the Legion Field, Evergreen Fields and Victoria Ballfields <br />• Package H — Irrigation <br />o Projects will involve upgrading to a 2-wire system that will allow for staff to <br />remotely operate the system. Additional irrigation will be added to Autumn Grove <br />Park to support heavy field use by youth recreation programs. <br />• Package I — Natural Resources <br />o The Natural Resource package includes both core projects and other projects. It is <br />the intent of the accepted proposal to be able to address all using the Renewal <br />Program budget and outside grants. Simply put the natural Resource package <br />removes invasives and restores these areas. The package includes a specific <br />maintenance agreement that will allow staff to develop a solid future program for <br />maintenance. The program also includes educational signage and the managed use <br />of volunteers to complete projects. The Natural Resource program will touch nearly <br />all areas of the City (22 of 30 parks). <br />Package J— Disc Golf Improvements <br />o Wark includes assessing design and performing improvements throughout the <br />course. <br />• Package K1 — County Rd B2 and Victoria Pathway. <br />o Sidewalks will be added to County Road B2 from Lexington Avenue to Rice Street <br />and from County Road B to County Road C along Victoria. <br />• Package K3 — Additional Sidewalks and pathways in Parks <br />o Selected parks will have pathway wark done to correct safety issues. <br />Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.