My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02574
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2500
>
pf_02574
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 11:57:24 AM
Creation date
12/8/2004 11:49:52 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2574
Planning Files - Type
Variance
Address
1633 TERRACE DR
Applicant
ADVANCE CIRCUITS
Status
APPROVED
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />MEMORANDUM <br /> <br />Date: <br /> <br />Februmy 10, 1994 <br /> <br />To: <br /> <br />Steve Sarkozy <br /> <br />From: <br /> <br />Mike Falk <br /> <br />Subject <br /> <br />Advance Circuits, Inc. <br /> <br />At their regular meeting of July 26, 1993, the Roseville City Council approved a <br />lot coverage variance for Advance Circuits, Inc. in order to build an addition to <br />their site that would connect the two buildings. This approval was conditioned <br />upon Advance Circuits meeting noise reduction compliance issues. Specifically, <br />the Council's action indicated that prior to the issuance of the Certificate of <br />Occupancy for the building addition, noise monitoring tests should be conducted <br />to insure that the strategies implemented by Advance Circuits to reduce noise <br />were effectively reducing the level of noise experienced by the neighborhood <br />north of Oasis Park. <br /> <br />Since the Council's approval of the variance, a number of noise reduction <br />strategies have been implemented, both by Advance Circuits Inc., in cooperation <br />with the City of Roseville: <br /> <br />Drill vacuum encased to prohibit sound escape. <br /> <br />Air exchange units on the roof encased with shrouds to prevent noise <br />escapes. <br /> <br />Benn constructed along the rear property line with a noise wall and <br />landscaping to follow in the Spring. The two buildings have been <br />connected, which will reduce noise associated with the ttansportation of <br />materials between the two facilities. <br /> <br />The third shift staff have been organized to reduce late night noise. <br /> <br />A phone/pager hotline number has been distributed to the neighbors to <br />call in noise complaints. <br /> <br />... <br />
The URL can be used to link to this page
Your browser does not support the video tag.