My WebLink
|
Help
|
About
|
Sign Out
Home
2014_0616_CCpacket
Roseville
>
City Council
>
City Council Meeting Packets
>
2014
>
2014_0616_CCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2014 1:54:21 PM
Creation date
6/12/2014 2:23:44 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br />Section 10 (4) If Grantee has failed Section 3(H)—The City shall have the right at No such provision. <br />to commence removal of the System, expiration of the Franchise to require the <br />... declare all right, title, and interest Grantee, at its expense, to remove all facilities <br />to the System to be in the City ... and restore affected sites to original condition. <br />Failure to do so results in facilities becoming <br />property of the City. The City will not be liable <br />to the Grantee for damage, loss or costs <br />associated. <br />System Capacity and Technical Design <br />Section 4(1) Specifies a 750 MHz Section 4(A) (1) (a)—Requirements for Section 3.5—Compliance with FCC <br />system, hybrid fiber coaxial capable characteristics, TBD per RFRP. standards. Upon receipt of customer <br />of high speed data and other complaints, City may inquire as to <br />competitive services Grantee's compliance. Also see Section <br />5.3, restrictions on reporting requirements. <br />No such provision Section 4(1) (b)—Requires TDD/TYY No such provision <br />equipment at Grantee's office and published <br />phone numbers for same. <br />N/A Section 4(A) (2)—Required features to be No such provision. <br />inserted as per RFRP. <br />No such provision Section 4(A) (3)—No channel mapping of PEG No such provision <br />channels without prior approval of the City. <br />Requires Grantee to agree to channel map as few <br />non-PEG channels as ossible in the attem t to <br />Initial Assessment 5-27-14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.